My WebLink
|
Help
|
About
|
Sign Out
Home
07/27/93
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
1990's
>
1993
>
07/27/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 2:48:56 PM
Creation date
4/2/2004 7:58:50 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
07/27/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
determine~ and the Commission shall then prepare plans ~'hJch will provi6e <br />capacJt)' to outlet the surface waters which ~'ill be collected within the <br />Lower Rum RJve~' wgtershed. In determininc %~,e necessary capac~t}, for sa~d <br />out]ets, the Commission sbal~ take into consideration the qua~tjt), of lan~ <br />~,Jthin the watershed which each membe~ governmental unit has to pond or act <br />as a reservoir for surface waters. ]t sba/] con£Jder only lands which are <br />under public ownership or under public contro] and that will be perpetually <br />dedicated to acting as a reservoir for surface waters. The Commission ma5. <br />require from each member 9overnmental unit a commitment in writin9 of the <br />lands which sba'll be so dedicated, including a legal description of the <br />gross area and the capacity in acre feet of water storage. No project which <br />will channel or divert additional waters to subdistrict and subtrunks which <br />cross municipal boundaries shall be commenced by any member governmental <br />unit prior to approval of the Board of the design of an adequate outlet or of <br />adequate storage facilities. The adequacy of said outlet shall be <br />determined by the Board after consultations with its professional <br />engineers. <br /> <br /> Subdivision ~. All construction, reconstruction, extension or <br />maintenance of outlets for the various subdistrict and subtrunks, <br />includin9 outlets, lift stations, dams, reservoirs, or other appurtenances <br />of a surface water or storm sewer system which involve construction by or <br />assessment ~gainst any member governmental unit or against privately or <br />publicly owned land within the watershed shall follow the statutory <br />procedures outlined in Chapter ~29 of the Minnesota Statutes except as <br />herein modified. The Board shall secure from"its engineers or some other <br />competent person a report advising it in a preliminary ~ay as towhetber the <br />proposed improvement is feasible and as to whether it shall best be made as <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.