My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 07/12/1993
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
1993
>
Agenda - Parks and Recreation Commission - 07/12/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 12:17:11 PM
Creation date
4/2/2004 8:48:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
07/12/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF R. AM. SEY <br /> <br />CAPITAL IMPROVEMENT/CAPITAL OUTLAY PLAN <br /> <br />199~ 1998 <br /> <br />Enalos~ is thc karnsex' Capita] lmprovements/Capiud Outlay Plan (CIP) for the yea.rs 19~.~ <br /> 199E. ii has veen prepared in an attempt to anumpatt ma)or capita] expenchtures in <br />advance of thc year in wi~ich they arc budget requests. ]~urthcr, scrota] pro.iccts may <br />interrelate or rc, qmrc other ~mprovcmems prior to ~niUation which would cause delays <br />without prior planning. Addinonally, prqiects rrm)' reaurrc budgeting over s~vcra] ),cars or <br />receipt of funtis from other sources (i.e. grants) requmng planning completion prior to the <br />funding ),car. FmMty, thc pian cnabies ~ snnpshot of thc identified capitol nee. ds of thc <br />eommumn.' allo~"mg for =onnnual prioririz2non of th:s: nee_~. <br /> <br />Approval of thc CIP by Council does not authorize spending or initiation of a given project. <br />h goes, however, provide a guide for the community for a whole array of private and <br />public decision rrmk'mg 'mpamed by public capital expenditures, therefore, the CIP should <br />receive ratificaUon only if the Council perceives a:uons contemplated within the plan as <br />reasonable and planned within justified nme frames. <br /> <br />"Fnc CIP is not intended to provid: for precise budgeting, Capital costs am proeztcd as <br />csnmates. Upon each up.re of thc plm,., detenons, additions, delays or other revisions <br />ma), occur reflecting changing ¢ommunit3, needs, <br /> <br />The enclosed plan is dJxdd~ mm two parts. First are the capital improvements which m <br />improvements to land (streets, parks, utilities and buildings). This plan shows <br />$1!,186,675 in improvements with revenues projected from nine funding sources, <br />lm~rovemcms from the Gert:raj ~und (g3..~5.000) are those requiring referenrium or <br />sirn~iar other authonn, resulting m listed .m-ojc,.m.s being less than cerr~iu. Thc oth~ funding <br />sources (except for mtergovernm:nml revenue - ~--,mt funds) have an in~emsc, d stability <br />over the general fund projects. <br /> <br />The Capital Outlay plan is limimd m roliing stor. k (:m-s, ~ct~, heaw' eqmpm:.nt). The <br />existing stock is shown with u value of ~1,551,000. PTO,ie:ted replaeemenrs or new <br />acrnuisitions ~ shown in !993 dollars at $1.267,000 i:~twecn me years 1993 and 2000. <br />Most of th: exmendimres (64.6%) arc within ~.tbii: Works with i7.~% planned for souad <br />replacement and 14.8% for fn'c app. mmm~. <br /> <br />The rotation for souads is sho~m at two each y¢~ with ~riminismmJve vehicles and light <br />trucks on a r. gn-vem- r~rflaeement szhe. dule. Twc>-ron rmzks are on a thirr~n-ye.m- <br />with heaD, c, qmpm:m and f:trt apparatus at rwenn' and twenty-five ye.m-s, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.