Laserfiche WebLink
,,~ree! Light System <br /> <br />,",,,~ ~".'iry's priority intersection street lighting system includes placing a cobra head light at all <br />5~ic:~-;~tions of Stat: trunk highways, county roads and arterial City streets. A four tiered priority <br />schedule was established for this system. A currant estimate for the installation and annual <br />,-~:?~. ~¢~on of the system is presented below: <br /> <br />Estimated Installation <br /> <br />Annual _Operation & <br />Maintenance Costs <br /> <br />A 18 $16,000 $1,620 <br />A & B 41 $36,100 $3,690 <br />A,B & C 57 $50,200 $5,130 <br />Complem 137 $120,600 $12,330 <br /> <br />The estimate for the complete priority lighting system is based upon the number of priority <br />intersections in existence in 1991 when the original policy was developed. It is reasonable to <br />anticipate that future developments will create additional intersections which would be added to the <br />priority intersection system. An increase of 10% to 15% within the next ten years seems likely. At <br />the present time, the City has expended approximately $14,000 to install 15 priority street lights. <br /> <br />In addition to the above, the City established a policy in 1991 that all future urban plats will receive <br />"Tradifionaire" subdivision lighting. The developer pays the capital cost and three years operations <br />and maintenance costs prior to filing the subdivision plat. As homes are placed on the utility <br />system a monthly operating charge for street lights is also put into effect. It is expected that this <br />procedure Mil allow for lot vacancies which will exist beyond the three year period covered by the <br />developer contribution. <br /> <br />prgiec/ - Marble District Year <br />Priority A Intersections N/A <br />Priority B Intersections N/A <br />Priority C Intersections N/A <br /> <br />Sweet Light Fund <br />Street Light Fund <br />Street Light Fund <br /> <br />MUNICIPAL FACILITIES IMPROVEMENTS <br /> <br />l;or a number of years the City of Rarnsey has been discussing expanding or replacing the existing <br />Public Works facilities at 142nd Avenue N.W. and Trunk Highway g47. Within this Capital <br />Improvements Program, it is projected that $1.5 million be encumbered in 1996 to either expand or <br />replace this facility or to construct a joint facility with another public or private parry. <br /> <br />With continued growth of the community, the Fire Depatu.uent has been studying the needs and <br />requirements of a satellite facility located in the vicirfity of Central Park. Within this Capital <br />Improvements Program, in 1998, such a facility, in addition to an expansion of the apparatus room <br />at the existing facility located at City Hall, is projected at a cost $475,000 out of the General Fund. <br /> <br />A $750,000 projection has been made for 1998 out of the General Fund for expansion of the <br />existing police facilities. It is contemplated, at this time, that the issue of expansion of both the <br />police and fire facilities and siting of a satellite fire facility would be taken up with the voters <br />through a referendum but that planning and needs studies for such should occur beginning in the <br />1995/1996 time frame. It is further contemplated that the public works facility, projected herein as <br /> <br /> <br />