My WebLink
|
Help
|
About
|
Sign Out
Home
02/02/93
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1993
>
02/02/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:22:39 AM
Creation date
4/2/2004 10:29:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
02/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. <br /> <br />1I. <br /> <br />12. <br /> <br />13. <br /> <br />OUTLINE OF MONITORING PROGRAM <br /> <br />Sample Type <br />Stack Emissions <br /> <br />Parameter <br />Particulates, opacity, SO2 <br />Temperature <br /> <br />Frequency* <br />Annually (3 samples <br />minimum per event) <br /> <br />The City and the Permit Holder may mutually agree to revise the monitoring program from <br />time to time. Such revisions shall be authorized in accordance with Condition 46 herein. <br /> <br />Afterbum¢r, The Permit Holder shall not use the melt furnaces for processing unless an <br />afterburner unit is installed and in operation on each melt furnace. <br /> <br />.Emergency Emissions Testing. If, in the opinion of the City Administrator or an authorized <br />representative, it is determined to conduct pollution tests during an officially reported <br />incident, the City may contract with an independent testing laboratory who shall be permitted <br />access to the facility to conduct tests as may be, prescribed by the City and to evaluate <br />conditions of the facility. The cost of such evaluation testing and reports shall be borne by <br />the Permit Holder and payment of such costs will be due within 30 days of the invoice date. <br /> <br />Corrective Actions. The City may order the Permit Holder to undertake corrective actions <br />within specific time frames based on test results or evaluation to remedy pollution problems <br />or nuisance complaints, ff the Permit Holder fails to take corrective action within specified <br />time frames, it may be determined by the City Council to be a violation of the CUP and cause <br />for permit revocation. <br /> <br />DisassemBly of Engines, Transmissions, Other Feedstock. Disassembly of engines, <br />transmissions and other feedstock shall not be permitted on the site under this Conditional <br />Use Permit unless conducted wholly within a building in accord with State and Federal <br />requirements. Cutting of uncontaminated feedstock to fit the melt furnaces shall be conducted <br />wholly inside the building. <br /> <br />Liquid Waste/Hazardous Wastes. All liquid waste, waste solvents, cleansers, or wastewater <br />generated from the disassembly and cleaning of vehicle engines or transmissions shall be <br />collected and stored in a leakproof system in accordance with state and federal regulations and <br />then transported off site. Waste fluids shall be stored inside the building in sturdy, leakproof <br />storage containers or tanks in accord with MN Rules 7045.0526 or 7045.0528. The Permit <br />Holder shall submit a copy of the original shipping manifest and the completed manifest for <br />hazardous waste quarterly to the City Zoning Administrator. A copy of the application <br />submittal for a Hazardous Waste Facility Permit shall be submitted to the City concurrently <br />with submittal to Anoka County and MPCA. A copy of the final permit, if approved, shall be <br />transmitted to the City within five days of receipt. <br /> <br />Storage of Received Materials. Feedstock, Separated Mater/als, and Equipment. Exterior <br />storage of materials either processed or unprocessed shall be screened from public view and <br />is allowed only within the 30'x50' area on the south side of the northerly principal structure <br />as designated in pencil on the site plan submittal to the City Council on April 23, 1991. <br /> <br />Feedstock. The Permit Holder shall limit his acceptance of metals to those which serve as <br />feedstock to the Aluminum processing operation and those incidental to the processing <br />operation. At no time does this CUP allow the Permit Holder to offer services for the <br />collection or drop off of scrap or waste metals which are not utilized as feedstock for the on <br />site processing operation (e.g., lead batteries, copper wire, white metals, etc.). <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.