My WebLink
|
Help
|
About
|
Sign Out
Home
02/02/93
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1993
>
02/02/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:22:39 AM
Creation date
4/2/2004 10:29:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
02/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In the future, it is anticipated that Sunfish Lake Blvd. will intersect T.H. #47 at the point <br />along the northern boundary of the Katnis property. We feel it may be advantageous to <br />accommodate westbound traffic from the subdivision by placing a street outlet from this <br />subdivision at this same location. If this were done, it may be necessary to modify the <br />location of the northern portion of the north/south street to discourage 149th Avenue traffic <br />from passing through the residential area of this plat to gain access to Sunfish Lake Blvd. <br /> <br />Input on both of the above comments should be received from Mn/DOT prior to authorizing <br />the preliminary plat. <br /> <br />The City's transportation plans call for a 120 foot right-of-way for major arterials. On <br />portions of the plat where trail does not run adjacent to T.H. #47, the preliminary plat <br />should reflect a 60 foot fight-of-way from the centerline of Hwy. #47. The preliminary <br />plat should also reflect that the building pads on the lots adjacent to Hwy.//47 can meet the <br />thoroughfare setback requirement of 50 feet from the highway fight-of-way or 110 feet <br />from the highway centerline, whichever is greater. <br /> <br />0 <br /> <br />Park Dedication. The proposed plat is being reviewed by the Park and Recreation <br />Commission on February 11. It is very likely that the park dedication will consist of <br />developing a pedestrian walkway running north and south through the plat to connect with <br />existing park areas in the district. Any balance of park dedication due would be satisfied by <br />a cash payment. <br /> <br />o <br /> <br />Drainage and Wetlan.ds: At this point, no grading and drainage plans have been received. <br />Possible outlets for drainage include a storm sewer in 149th Avenue and a wetland with an <br />outlet to the Rum River south of 147th Lane in River's Bend. The developer will be <br />expected to submit a drainage plan along with hydraulic calculations at the time of <br />Preliminary Plat. A 100 year flood elevation on existing or created wetland should be <br />established to identify acceptable house pad elevations. The extent of all wetland should be <br />delineated and identified on the grading plan so compliance with the wetland conservation <br />act can be determined. <br /> <br />The Planning and Zoning Commission will be meeting at 7:30 p.m. on Tuesday, February 16, <br />1993 to consider the request for sketch plan review of Amber Ridge. We suggest that you, or your <br />representative, be present at the meeting to answer any questions that may arise. <br /> <br />If you have any questions, please feel free to call at 427-1410. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Sylvia Frolik <br />Zoning Administrator <br /> <br />City Engineer <br /> <br />Peter Raatikka <br />Hakanson Anderson Associates, Inc. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.