My WebLink
|
Help
|
About
|
Sign Out
Home
02/02/93
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1993
>
02/02/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:22:39 AM
Creation date
4/2/2004 10:29:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
02/02/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24. <br /> <br />25. <br /> <br />26. <br /> <br />27. <br /> <br />28. <br /> <br />29. <br /> <br />30. <br /> <br />31. <br /> <br />32. <br /> <br />Screeninq. The Permit Holder agrees to screen the aluminum <br />processing facility from any public street. Such screening <br />shall be achieved using grading, landscape elements, and/or <br />plant materials which will achieve up to 90% opacity. <br />Supplemental screening of the Site may be ordered by the City <br />to comply with the then current screening requirements for <br />outside storage on industrial property. <br /> <br />Off-Street Parkinq. Off-street parking shall be provided such <br />that there is at least one parking space for each employee on <br />the maximum working shift plus three spaces for visitor <br />parking. <br /> <br />Surfacin~ of Work Areas. Ail storage areas, parking areas and <br />driveway areas shall be surfaced with bituminous or concrete. <br /> <br />Buildinq Permits. No construction or remodeling of any <br />structures shall commence prior to the issuance of a building <br />permit by the City Building official and site plan approval <br />by the City Council. <br /> <br />Electrical. The .building's electrical system must be <br />inspected and brought up to code within 30 days of this CUP. <br />An affidavit of compliance shall be filed with the City within <br />five working days after final inspection. <br /> <br />Sanitary Sewer. The Permit Holder shall petition for City <br />sewer and water within 30 days of the date of action on this <br />CUP. In the event that the petition fails, the Permit Holder <br />shall install an on-site system or submit an alternative <br />sewage handling treatment plan for.Council approval. <br /> <br />Scope and Conduct of Operations. The operations permitted by <br />this CUP may be performed on the Subject Property in confor- <br />mance with existing statutory and regulatory authority and <br />requirements of the City, Anoka County, Minnesota ("County"), <br />and the Minnesota Pollution Control Agency ("MPCA"). <br /> <br />Furnaces. This permit shall be issued allowing for the use <br />of two melt furnaces as described by the applicant in the CUP <br />application support information. An increase in furnace <br />capacity or a third melt furnace shall not be added to the <br />operation without application and approval of a new CUP. <br /> <br />Closure Due to CUP Revocation~ Other Circumstances. In the <br />event this CUP is revoked or the Permit Holder closes <br />operation of the aluminumprocessing operation for any reason, <br />including but without limitation, order of the court or other <br />agency of competent jurisdiction, bankruptcy, insolvency, or <br />abandonment, the Permit Holder shall immediately proceed to <br />remove all feedstock and other material from the site. In the <br />event the Permit Holder fails to comply with the terms of this <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.