My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/09/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 02/09/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:48:49 PM
Creation date
4/6/2004 11:29:17 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/09/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE I <br /> <br />ESTIMATED PROJECT #92-20 COSTS <br /> <br />Bituminous Paving 450 tons @ $25/ton $11,250 <br />Class V Base Course 1050 tons @ $6/ton 6,300 <br />Shaping and Grading Lump Sum COO0 <br />Culverts 4 each @ $300 each 1,200 <br />Turf Restoration 1.5 acres @ $1,500/acre 2,250 <br /> <br />Estimated Construction Cost <br /> <br />Overhead Costs @ 30% Construction Cost <br /> <br />$27,000 <br /> <br />8,100 <br /> <br />Total Project Cost $35,100 <br /> <br />TABLE 2 <br /> <br />ESTIMATED PROJECT ~t92-23 COSTS <br /> <br />Bituminous Paving 420 tons @ $25/ton $10,500 <br />Class V Base Course 970 tons @ $6/ton 5,820 <br />Shaping and Grading Lump Sum 6,000 <br />Culverts 6 each @ $300 each 1,800 <br />Turf Restoration .75 acres @ $1,500/acre 1,125 <br /> <br />Estimated Construction Cost $25,245 <br /> <br />Overhead Costs @ 30% Construction Cost <br />Right-of-Way Acquisition <br /> <br />7,574 <br />3,500 <br /> <br />Total Project Cost $36,319 <br /> <br />FINANCING pROJECT #92-20 <br /> <br />Exhibit A identifies seven properties which will receive direct benefit from this project. Parcels 2, <br />4, and 7 contain existing residences which have their vehicular access onto Bison Street N.W., <br />either directly or by easement. Parcels I and 3 currently have no habitable residences, but are <br />buildable lots which can obtain building permits without further subdivision. Parcels 5 and 6 are <br />comer lots of the Dellwood Hills subdivision having frontage on both 171st Avenue N.W. and <br />Bison Street N.W. When Dellwood Hills was platted, the Development Agreement acknowledged <br />a partial responsibility toward the paving of Bison Street N.W. An escrow of $9,434 was placed <br />on deposit with the City which represented the estimated fair share of two buildable lots. <br /> <br />It is proposed that all seven of these benefitted lots be assessed equally regardless of individual <br />front fo@rages or value of improvements or individual lots, as this has been past City policy on <br />previous paving projects. However, the $9,434 escrow posted by the developers of Dellwood <br />Hills will be applied equally against the assessments due to parcels 5 and 6. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.