My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/09/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 03/09/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:50:05 PM
Creation date
4/6/2004 12:37:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/09/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTHER COSTS <br /> <br />In addition to the assessed costs identified in the previous section, each property owner will incur <br />various out-of-pocket costs when a residence is connected to the system. The City has a policy of <br />requiring connection to an existing unit to the system within two years of avail'ability. A $725 <br />Water Availability Charge (W.A.C.) is collected to defray the depreciation costs of the municipal <br />water system. A $750 Sewer Availability Charge (S.A.C.) is collected by the City to be paid to the <br />Metropolitan Waste Control Commission to defray the reserved capacity designed into treatment <br />and transmission facilities. A $167 fee is collected to cover the cost of the water meter, remote <br />meter reader and installation. Finally, each property owner must pay the costs associated with <br />extending the utilities from the right-of-way into their dwellings and abandonment of an existing on- <br />site sewer system and well if it is no longer going to be used. These costs are highly variable <br />depending on individual circumstances. <br /> <br />PROJECT SCHEDULES <br /> <br />For this project to proceed the following schedule could be anticipated: <br /> <br />Accept feasibility study and set public hearing <br />Hold public hearing <br />Order plans and specifications <br />Approve plans and specifications and set bid date <br />Receive bids and award project <br /> <br />Begin construction <br /> <br />Complete construction <br /> <br />Hold assessment hearings <br /> <br />First payment due with real estate taxes <br /> <br />March 9, 1993 <br />April I3, 1993 <br />June 22, i993 <br />July I3, 1993 <br />August 10, 1993 <br />Late August 1993 <br />October t993 <br />October 1993 <br />May 1994 <br /> <br />4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.