|
North Park
<br />
<br />Sitework
<br />Total
<br />Erosion Control
<br /> perimeter silt fence
<br /> wetland silt fence
<br />Civil Utilities
<br /> misc utilities connections
<br />Earthwork & Drain~ile
<br /> sledding hill + bowl
<br /> rough grading
<br /> finish grading
<br /> Swim pond/Oxbow Pond
<br /> rough grading
<br /> finish grading
<br /> Parking 30 Spaces
<br /> rough grading
<br /> finish grading
<br />Bituminous
<br /> 8' walking paths
<br /> 10' mixed use trail
<br /> Parking lot
<br />Concrete
<br /> pavillion pad
<br /> curb + gutter parking lot
<br /> conc pads 6 - benches
<br />
<br /> conc pads 6 - tables
<br />Architecture + Amenities
<br /> Swim Pond/Wading Pool
<br /> Playground
<br /> Hill top Pavillion
<br /> Pedestrian bridge
<br /> Monuments
<br />Lighting + Site Electrical
<br /> building electrical service
<br /> site electrical service
<br /> decorative post top light
<br />Site Furnishings
<br />
<br /> benches park
<br /> trash receptacles
<br /> picnic tables
<br /> drinking fountain
<br /> grilles
<br />Miscellaneous Landscape Improvements
<br /> native seeding
<br /> turf seeding
<br /> trees 2 1/2"
<br /> trees 6' clump
<br /> trees 5' conifer
<br /> shrubs #5
<br />
<br />Ramsey Town Center Parks Proposal Analysis
<br />for
<br /> Ramsey Park Recreation Commission
<br />
<br />City Priorities
<br />
<br />Estimate LLC Proposal
<br />1,187,592.00 545,033.50
<br />6,428.00 6,428.00
<br />5,028.00 e
<br />1,400.00 e
<br />35,000.00
<br />35,000.00 c
<br />76,500.00 58,500.00
<br />
<br /> 30,000.00 e
<br /> 24,000.00 e
<br />
<br /> 10,000.00 c
<br /> 8,000.00 c
<br />
<br /> 2,500.00 e
<br /> 2,000.00 e
<br /> 75,024.00 56,178.00
<br /> 5,886.00 e
<br /> 50,292.00 a
<br /> 18,846.00 c
<br /> 19,362.50 6,150,00
<br /> 2,750.00 c
<br /> 10,462.50 c
<br /> 3,450.00 a
<br /> 2,700.00 a
<br /> 776,000.00 236,000.00
<br /> 500,000.00 c
<br /> 200,000.00 a
<br /> 35,000.00 c
<br /> 36,000.00 a
<br /> 5,000.00 c
<br /> 62,500.00 45,000.00
<br /> 2,500.00 c
<br /> 15,000.00 c
<br /> 45,000.00 a
<br /> 37,600.00 37,600.00
<br /> 20,000.00 a
<br /> 6,000.00 a
<br /> 5,700.00 a
<br /> 5,000.00 a
<br /> 900.00 a
<br /> 99,177,50 99,177.50
<br /> 7,840.00 e
<br /> 22,837.50 e
<br /> 40,000..00 e
<br /> 16,000.00 e
<br /> 8,000.00 e
<br /> 4,500.00 e
<br />
<br />Essentials
<br /> 169,991.50
<br />
<br /> 5,028.00
<br /> 1,400.00
<br />
<br /> 30,000.00
<br /> 24,OOO.O0
<br />
<br /> 2,500.00
<br /> 2,000.00
<br />
<br /> 5,886.00
<br />
<br /> 7,840.00
<br /> 22,837.50
<br /> 40,000.00
<br /> . 16,000.00
<br /> 8,000.00
<br /> 4,500.00
<br />
<br />Amenities
<br /> 375,042.00
<br />
<br />50,292.00
<br />
<br />3,450.00
<br />2,700.00
<br />
<br />200,000.00
<br />36,000.00
<br />
<br />45,000.00
<br />
<br />20,000.00
<br />6,000.00
<br />5,700.00
<br />5,000.00
<br />900.00
<br />
<br />Future City
<br />Improvements
<br /> 642,558.50
<br />
<br />35,000.00
<br />
<br />10,000.00
<br />8,000.00
<br />
<br />18,846.00
<br />
<br />2,750.00
<br />10,462.50
<br />
<br />500,000.00
<br />35,000.00
<br />5,000.00
<br />
<br /> 2,500.00
<br /> 15,000.00
<br />
<br />pnnted 4/2/2004
<br />
<br />
<br />
|