CHANGE ORDER NO.2 <br />CITY IMPROVEMENT PROJECT g92-13 <br /> <br />Improvement Project: <br />Contractor: <br />Current Contract Amount: <br />Award Date: <br />Completion Date: <br /> <br />g92-17; Sanitary Sewer Construction <br />Bonine Excavating Inc., Elk River, MN <br />$478,294.53 (includes C.O. #1) <br />August 26, 1992 <br />June 1, 1993 <br /> <br />Description and Justification of Change: <br /> <br />Subsequent to the award of Improvement Project g92-17 to the contractor, a petition was received <br />for the installation of a small amount of sanitary sewer in an area in close proximity to the project <br />site. Improvement Project ~92-13 was established in response to this petition, and has progressed <br />to the point where on January 26, 1993, City Council authorized the project to proceed. The <br />original project was competitively bid and State Statute 429.041 (7) allows for increasing the scope <br />of such a public project by Change Order up to an amount of 25% of the original contract at the <br />same unit prices. The total cost of Improvement Project g92-13 falls within this allowable range. <br />The contractor is agreeable to extending the scope of the project at the bid prices. The work shall <br />be performed in accordance with a one sheet set of plans last revision March 16, 1993, prepared by <br />Steven J. Jankowski and the specifications for Project g'92-I7. <br /> <br />Change in Cost: <br /> <br />The contractor and owner agree to the following unit prices as the basis for the expanded scope of <br />work. Estimated quantities below provide the projected increase in the contract amount. <br /> <br />Item/Description <br /> <br />Estimated <br />Ouanfi .ty Unit Price Extcn$ion <br /> <br />8" PVC SDR 0-10'dp 75 Ft. <br />8" PVC SDR 10-12'dp 120 Ft. <br />8" PVC SDR 12-14'dp 230 Ft. <br />48" diameter manhole w/casting 8' dp 2 Ea. <br />Excess manhole depth > 8' dp 5.9 Ft. <br />Service pipe 6" PVC 30 Ft. <br />Service wye 8"x6" PVC 2 Ea. <br />Service riser 1 Ea. <br />Turf establishment 0.5 acre <br /> Total Change Order Price <br /> <br />Revised contract amount including this Change order. <br /> <br />8.00/Ft. 600.00 <br />9.00/Ft. 1,080.00 <br />10.00/Ft. 2,300.00 <br />965.00/Ea. 1,930.00 <br />68.00/Ft. 401.20 <br />*7.00/Ft. 210.00 <br />*35.00/Ea. 70.00 <br />90.00/Ea. 90.00 <br />970.00/acres 485.00 <br /> 7,166.20 <br /> <br />$485,460.73 <br /> <br />* Unit price negotiated as no unit price was available from original Project g92-17. <br /> <br /> <br />