My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/23/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 03/23/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:50:18 PM
Creation date
4/9/2004 10:37:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/23/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASE # 5 <br /> <br />REQUEST FOR FINAL PLAT APPROVAL OF <br /> RAMSEY MEADOWS 2ND ADDITION; <br /> CASE OF GILBERT MENKVELD <br /> By: Zoning Administrator Sylvia Frolik <br /> <br />Background: <br /> <br />The preliminary plat approved on May 26, 1992 for Ramsey Meadows consisted of 29.5 acres to <br />be subdivided into approximately 29 single family lots. At this time, Mr. Menkveld is proposing <br />to final plat the second phase of Ramsey Meadows which consists of 14 lots. <br /> <br />Observations: ~- F-t .... .,, t <br /> <br />All of the lots in this second phase of Ramsey Meadows meet the minimum lot dimension <br />requirements and do contain at least 10,800 square feet of area above ordinary high water. <br /> <br />As you ma), recall, the preliminary plat approval was contingent upon resolving DNR concerns <br />with impacts to the wetland associated with constructing 150th Avenue N.W. as a through street. <br />As a result of DNR opposition to constructing a through street in the wetlands, the lots in this <br />second phase of Ramsey Meadows are being served by two cul-de-sacs versus a through street. <br />The cul-de-sacs do not exceed the maximum length estal31ished by City Code. <br /> <br />In accordance with the recommendation of the Park and Recreation Commission at the time of <br />preliminary plat review, park dedication will be satisfied with a cash payment. However, Staff has <br />identified a need for a pedestrian/bike path connector between Blocks 1 and 2 to make effective use <br />of the trail between 150th and 149th Lane. The de{,eloper has provided a 20 foot wide park <br />corridor for this purpose and will be obligated to construct an 8 foot wide bituminous path. The <br />development of this connector path is of no use without a similar commitment from the property <br />owner to the south. Negotiations with the property owner to the south have not been finalized. <br />The development agn'eement for Ramsey Meadows proposes that the developer escrow the funds <br />necessary to construct the paved path and if the trail connector is not feasible with the property <br />owner to the south, then the developer of Ramsey Meadows would receive a refund of the <br />construction funds that have been escrowed. <br /> <br />The following items are enclosed for your information: <br /> <br />a) <br />b) <br />c) <br />d) <br />e) <br /> <br />Site location map <br />Proposed final plat <br />City Staff review letter dated March 18, 1993 <br />Proposed resolution <br />Proposed development a~eement <br /> <br />Recommendation: <br /> <br />City Staff recommends final plat approval of Ramsey Meadows 2nd contingent upon compliance <br />with City Staff review letter dated March 18, 1993. <br /> <br />Council Action: <br /> <br />Motion to: <br />Adopt Resolution #93-03- _ <br />Addition. <br /> <br />_ granting final plat approval to Ramsey Meadows 2nd <br /> <br />Review Checklist: <br /> <br />CiD, Engineer <br />Zoning Adrrdnisrrator <br /> <br />CC: 3/23/93 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.