ESTIMATED COSTS <br /> <br />The project is summarized in Table 1 below. An itemized breakdown of the construction costs are <br />presented in Appendix B. The construction costs summarized in Table 1 have been divided into <br />project assessable costs and trunk eligible costs. The project assessable costs are those costs <br />necessary to provide service to the project area alone. The trunk eligible costs represent those costs <br />associated with oversizing certain elements of the project to serve adjacent areas outside the project <br />area. In this project, the difference in cost between an eight inch and twelve inch watermain is <br />considered trunk eligible as would the extra depth of the sanitary sewer down Helium Street N.W. <br />to service the area to the north. <br /> <br />In addition to construction costs, Table 1 contains overhead costs on the amount of 30% of the <br />construction costs. Overhead costs include, but are not limited to engineering, construction <br />staking, inspection, fiscal, legal, administrative and contingency costs. An estimate of these costs <br />is as follows: <br /> <br />Engineering 10% <br />Staking and Inspection 7% <br />Fiscal and Legal 3% <br />Administration 5% <br />Contingencies 5% <br /> <br />In addition, acquisition of the Jones easement has been added to the construction and overhead <br />costs to obtain the resultant total project cost. The easement acquisition cost has been estimated <br />based upon right-of-way acquisition settlements on similar City projects. The above easement <br />acquisition cost is based upon it being obtained through..negotiation and does not anticipate the <br />costs of eminent domain procedures. <br /> <br />TABLE 1 <br /> <br />Project Components <br /> <br />ESTIMATED <br /> <br />PROJECT g92-22 COSTS <br /> <br /> Project' Trunk <br /> Assessable Attributable <br /> <br />Total <br /> <br />Sanitary Sewer <br />Watermain <br />Storm Sewer <br />Street Improvements <br />Total Construction Cost <br /> <br />41,320 *~,~ 3,4.95 ¢?~.'; 44,815 <br />4,,,,75 ~,~'; .7-;600 ~1~-~0 54,675 <br />9,750 -0- 9,750 <br />52,659 -0- 52,659 <br />1~50,804 m,~ 11~95 ~,~ 161,899 <br /> <br />Overhead Costs @ 30% Const. Cost <br />Easement Cost <br /> <br />Total Project Cost <br /> <br /> ~4-5;24 t <br /> <br /> 2~7_94~ <br /> L98~-839 <br /> <br />Revised March 17, 1993 <br /> <br />-3~-,329 ~-,* ~ <br /> <br /> 206 ~oo <br /> <br /> 48,570 <br /> <br /> 3,000 <br />213,469 <br /> <br /> <br />