My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/11/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 05/11/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:51:13 PM
Creation date
4/9/2004 1:41:16 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/11/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAGE I IMPROVEMENTS AND FINANCIAL GUARANTEES: <br /> <br />City Code Compliance. That the DEVELOPER will develop the Plat in accordance <br />with the City Code, Section 9.50, entitled "Subdivision. <br /> <br />Conformance with Plan. The Plat shall be developed pursuant to the final plat <br />consisting of one (1) sheet prepared by Jeffrey Caine, Caine & Associates Land Surveyors, <br />Inc., entitled Ramsey Commons 2nd Addition. <br /> <br />Incorporation of All 'City Code Reouirements. That the recitals above and the <br />provisions of the City Charter, Subdivision Code, Zoning Code and Public Improvement <br />Code of the CITY, as mended to date hereof, are incorporated herein by reference. <br /> <br />Stage I Improvements Required. The DEVELOPER agrees to construct the <br />required Stage I Improvements according to the terms and conditions of this contract and in <br />accordance with DEVELOPERS' plans submitted to the CITY. Said plans shall be in <br />general conformance with the Grading and Drainage Plan prepared by Jeffrey N. Caine and <br />dated March 17, 1993. The final construction plan for sanitary sewer, storm sewer, <br />watermain, and street improvements shall be submiued to the City Engineer for review and <br />approval prior to construction. The DEVELOPER shall also be responsible, at its <br />expense, for installation of gas, telephone, and electric utiity improvements, with the <br />exception of street lights. The DEVELOPER shall be responsible for completing the <br />rough grading and providing lot comer stakes prior to the installation of underground <br />utilities. <br /> <br />Boulevard and Area Restoration. The DEVELOPER shall be responsible for the <br />cost of establishing seed or sod in all boulevards within thirty (30) days of the completion <br />of the street improvements, and restoring all other areas disturbed by the development <br />grading operation in accordance with the approved erosion and sediment control play_ The <br />DEVELOPER shall also be responsible for the cost of clearfing any soil, earth or debris <br />from the wetlands within and adjacent to this Plat resulting from grading performed in the <br />development of the land. <br /> <br />Reouirements After Street Surfacing. After the street surfacing is installed, the <br />DEVELOPERS shall clear any soil, earth, or debris from the streets and from the lots <br />within the Plat resulting from any construction on the Subject Property by the <br />DEVELOPER or their successors and assigns. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.