My WebLink
|
Help
|
About
|
Sign Out
Home
06/08/93
Ramsey
>
City Council
>
Full Agenda
>
1990's
>
1993
>
06/08/93
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2022 9:27:02 AM
Creation date
4/12/2004 9:46:21 AM
Metadata
Fields
Template:
Full Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
inches in diameter must be salvaged for lumber, firewood, chipped or hauled to a licensed <br />wood disposal site. Application may be made for an open burning permit to dispose of <br />brush less than six (6) inches in diameter and stumps with less than four feet of main <br />trunks attached. The location of the proposed open burn site will be specified by the City <br />Engineer, Environmental Specialist and Fire Chief. Wood disposal by burning requires <br />whole tree volume reduction, proposed site inspection prior to clearing and an open <br />burning permit. Residual ash and unburned stumpagc may be buried on the site at the <br />direction of thc City Engineer. Chipped material may be applied and utilized on site to <br />mitigate root damage from grade changes of the easement or right-of-way and for erosion <br />control and top soil restoration. <br /> <br />18.Construction Site Maintenance. The DEVELOPER shall adhere to all City <br /> ordinances relating to, but not limited to, dumping of garbage, site development, <br /> construction debris, open burning, etc. <br /> <br />19. Estimated Cost. It is understood and agreed that cost amounts set forth in this <br /> Agreement as Stage I and Stage II Improvements, unless specified as fixed amounts, are <br /> estimated. The DEVELOPER agrees to pay the entire cost of said improvements <br /> including interest, fiscal engineering and legal charges. <br /> <br />20. Plat Ap_nroval Expenses. The DEVELOPER agrees that it wilI pay to the CITY all <br /> CITY expenses incurred in the approval of the Plat, including, but not limited to <br /> administration expenses, engineering and legal fees. Said expenses shall be paid within <br /> fifteen (15) days of billing by the CITY and outstanding billings shall be paid prior to <br /> recording of the Final Plat. Any expenses incurred after recording of the Final Plat shall <br /> also be paid within said fifteen (15) day billing period. Failure to pay the CITY'S <br /> expenses within the fifteen (15) day billing period will permit the CITY to draw upon any <br /> of the escrows required by this contract for payment. <br /> <br />21. Reimbursement tO the City, The DEVELOPER agrees to reimburse the CITY for <br /> all costs incun'ed by the CITY in defense or enforcement of this Agreement, or any portion <br /> thereof, including court costs and reasonable engineering and attorney's fees. <br /> <br />22. Mark~tlable Title, Prior to recording of the Final Plat, the DEVELOPER shall provide <br /> the CITY proof of marketable title to the Plat either through a currently certified abstract, <br /> registered property abstract or title insurance. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.