My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/13/1993
Ramsey
>
Public
>
Agendas
>
Council
>
1993
>
Agenda - Council - 07/13/1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 3:52:54 PM
Creation date
4/12/2004 11:12:33 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/13/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
determined and the Commission shall then prepare plans which will provide <br />capacity to outlet the surface waters which will be collected within the <br />Lower Rum River watershed. In determining the necessary capacity for said <br />outlets, the Commission shall take into consideration the quantity of land <br />within the watershed which each member governmental unit has to pond or act <br />as a reservoir for surface waters. It shall consider only lands which are <br />under public ownership or under public control and that will be perpetually <br />dedicated to acting as a reservoir for surface waters. The Commission may <br />require from each member governmental unit a commitment in writing of the <br />lands which shall be so dedicated, including a legal description of the <br />gross area and the capacity in acre feet of water storage. No project which <br />will channel or divert additional waters to subdistrict and subtrunks which <br />cross municipal boundaries shall be commenced by any member governmental <br />unit prior to approval of the Board of the design of an adequate outlet or of <br /> <br />adequate storage facilities. The adequacy of said outlet shall be <br />determined by the Board after consultations with its professional <br />engineers. <br /> <br /> Subdivision 4. All construction, reconstruction, extension or <br />maintenance of outlets for the various subdistrict and subtrunks, <br /> <br />including outlets, lift stations, dams, reservoirs, or other appurtenances <br />of a surface water or storm sewer system which involve construction by or <br /> <br />assessment against any member governmental unit or against privately or <br />publicly owned land within the watershed shall follow the statutory <br />procedures outlined in Chapter 429 of the Minnesota Statutes except as <br /> <br />herein modified. The Board shall secure fromits engineers or some other <br />competent person a report advising it in a preliminary way as towhetber the <br />proposed improvement is feasible and as to whether it shall best be made as <br /> <br />-17- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.