?iTX~MATED PROJECT COSTS <br /> <br />A detailed estimate of construction costs are presented in Table 1. In addition to the construction <br />costs, overhead costs include engineering, construction staking and inspection, legal, <br />admJmstration, interest during construction, and contingencies. The overhead costs for the project <br />are estimated based upon percentages of construction cost. Those percentages are estimated to be <br />as follows: <br /> <br />Engineering <br />Staking and Inspection <br />Bonding and Legal <br />Ciw Staff Administration <br />Contingencies <br /> <br />10% <br /> 7% <br /> 3% <br /> 5% <br /> 5% <br /> <br /> TABLE 1 <br /> PROJECT #93-13 <br />ESTIMATED PROJECT COST <br /> <br />Improyernent Ouanri _fy Cost Total <br /> Project Cost <br />Bituminous Paving 364 tons $25 ton $9,100 <br />Class V Base 740 tons $6 ton $4,440 <br />Shaping and Grading Lump Sum $3,000 $3,000 <br />Turf Restoration 1.12 ac. $1,500/acre $1693 <br />Construction Cost Total $18,233 <br />Overhead @ 30% $5.470 <br />Total Project Cost $23,703 <br /> <br />Exhibit A identifies fourteen properties which were determined to receive direct benefit from this <br />project. All benefited parcals, except parcels 8 and 11, are developed with single family <br />residences. Parcels 8 and 11 are considered to be buildable. It is proposed that all directly <br />benefitted lots be equally assessed regardless of individual front footages or value of improvements <br />on individual lots, as this has been past City policy on previous paving projects. <br /> <br />If the project should proceed to the stage where the City Council authorizes plans to be prepared <br />and bids to be solicited as required by law, the Cit3, Council may award the construction to the <br />lowest responsible bidder, providing that bid does not exceed 110% of the construction costs <br />estimates conta/ned herein. After the project has been completed and final costs are known, the <br />public hearing will be held which will identify the actual costs to be recovered by special <br />assessment. Each property may, at any time prior to certification of the assessment to the County <br />Auditor, pay the whole of the assessment of such property, with interest, except that no interest <br />shall be charged if the entire assessment is paid within (30) days from the adoption of the <br />resolution. Special assessments reported to Anoka County shall be payable over a ten (10) year <br />period with interest at a rate of 2% above prime rate at the time of the special assessment hearing. <br />This rate is estimated to be 8%. The costs presented in this report are estimates. Table 2 presents a <br />project financing summary as it would affect individual properties. <br /> <br />2 <br /> <br /> <br />