Laserfiche WebLink
89z22x93 <br /> <br />'1 <br /> <br />PARTIAL PAY ESTIMATE NO. 1 <br /> <br />DATE: September 22, 1993 <br /> <br />PROJECT; ~e93-10 River's Bend 3rd <br /> <br />CONTRACTOR: Annendale Contracting, Inc. <br /> <br />CURRENT CONXlL~CT AtVlOUNT: $136,023.76 <br /> <br />AWARD DATE: June 8, 1993" <br /> <br />The following work has been completed to date on the above referenced project: <br /> <br />Schedule A - Sanitary Sewer <br /> <br /> Item Ou_ ~ti_ty <br /> i. 8" PVC Sanitary Sewer 381 <br /> 2. tO" PVC Sanitary Sewer 191 <br /> 3. 48" diameter manhole 0-8" depth 2 <br /> 4. Excess depth manhole 15 <br /> 5. 4" PVC ser55ce 630 <br /> 6. 6" PVC service 117 <br /> 7. Service riser 0 <br />8. 8x4 saddle wTe 6 <br />9. 8x5 saddle wye 3 <br />10. 8x4 wye i1 <br />I 1.Adjust existing manhole 0 <br />12 Core bore existing manhole lump sum <br /> Total Schedule A <br /> <br /> 15/1 ft. <br /> 17/1 ft. <br />1250 / ea. <br /> 60/ft. <br />7.50 / ft. <br />8.50 / ~ <br /> 50 / e.a. <br /> lC>0/em <br /> li0/ea. <br /> 50/~. <br /> 350 / ea. <br />IB81 <br /> <br /> 5,715.00 <br /> 3,247.00 <br /> 2,500.00 <br /> 900.00 <br /> 4,725.00 <br /> 994.00 <br /> 0 <br /> 600.00 <br /> 330.00 <br /> 550.0O <br /> 0 <br /> 1881.00 <br />$2,1,442.50 <br /> <br />lo,/ <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />