Laserfiche WebLink
'*Schedule B · Watertnatn <br /> <br /> 1. 10" DIP class 52 <br /> 2. 6" DIP class 52 <br /> 3. i0" Crate valve with box <br /> 4. 6" Gate valve with box <br /> 5. Standard hydrant <br /> 6. 1" Corporations <br /> 7. 1" Corporation stop with box <br /> 8. 1" Cooper service <br /> 9. Connect existing wa~er main <br />10. Ductile iron fittings <br /> Total Schedule B <br /> <br />704 <br />463 <br />1 <br />4 <br />3 <br />17 <br />17 <br />558 <br />lump sum <br />1850 <br /> <br />20.70 / ft. <br />16.70 / ft. <br /> 650 / ~ <br /> 340 / eai <br />1.2OO / ea~ <br /> 25 / em <br /> 75/ea. <br /> 7.00 / ft. <br /> 2OO <br /> .90 / lb. <br /> <br /> 14,572.80 <br /> 7,732.10 <br /> 650.0O <br /> 1,360.00 <br /> &,600.O0 <br /> 425.0O <br /> 1.275.o0 <br /> 3,906.00 <br /> 200.00 <br />1,665.00 <br />$35,38~.90 <br /> <br />Schedule C - Storm Sewer <br /> <br />1. 12" RC, P <br />2. 27" RCP <br />3. 30" RCP <br />4. 54" Stmma manhole* <br />4a. 60" Storm manhole* <br />4b. 66" Storm <br />'5. Standard catch basin with casting <br /> 6. Connect to existing storm <br /> Total Schedule C <br /> <br />* Field change - from 48" m~nhole <br /> <br /> 94 <br /> 635 <br /> 2 <br /> 1 <br /> <br /> 2 ea. <br />lump ~um <br /> <br />16,00 / ft. <br />29.oo/~ <br />32.OO / ft. <br />t,165.94 / <br />1,287.25 / <br />1,436.67 / <br /> 700 / ~a, <br /> 297.10 <br /> <br />2,726.00 <br />20,320.00 <br />2,331.88 <br />1,287.25 <br />2,873.34 <br />1,400.00 <br />297.10 <br /> <br /> <br />