My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 03/31/2015
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2010 - 2019
>
2015
>
Minutes - Public Works Committee - 03/31/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:25:41 PM
Creation date
6/1/2015 8:52:45 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
03/31/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. COMMITTEE BUSINESS <br /> 5.01: Consider Options for Addressing Stormwater Drainage Issues in Low Lying, Land <br /> Locked Areas <br /> Civil Engineer II Linton reviewed the staff report and identified the 2014 areas of flooding <br /> concern. He identified the wetlands within the City, noting that approximately 20 to 25 percent <br /> of the City is wetland. He identified areas of flooding concern from previous years beginning in <br /> 1985 and moving forward to 2011 for comparison purposes. He explained the staff report <br /> focused on three primary areas of concern, and that the staff report lists these in order of priority <br /> based on magnitude and severity of property and structure impacts. <br /> The Gibbon Street area, rated the highest priority in the staff report, was discussed in detail first. <br /> Civil Engineer II Linton reviewed several potential routes of relief for this land-locked wetland, <br /> including relative elevation differences and any easements that existed along the routes. He <br /> discussed that ditch 66 was cleaned a few years prior and that weirs had been installed. He <br /> explained that vegetation management can occur within a wetland but the elevation cannot be <br /> changed. He noted that similar plans are available for discussion along the other two areas <br /> addressed within the case, but that residents from Gibbon Street are in attendance. <br /> Chairperson Riley questioned if there is a good or easy answer. <br /> Civil Engineer II Linton stated that while there is no easy answer there are potential solutions. <br /> He stated that the potential routes are where solutions could occur. <br /> City Engineer Westby stated that there could be a combination of ditches and pipes in the routes. <br /> Councilmember Johns stated that it appears the southern route would make the most sense. <br /> Chairperson Riley questioned if the route would simply push the problem down the line. <br /> Civil Engineer II Linton replied that if the water were to be routed into the ditch he believed that <br /> it would continue to flow to Trott Brook. <br /> Frank Miske, 17421 Gibbon Street NW, stated that water even reaches high levels at certain <br /> times and could also be a concern for overflowing. He stated that the issues on Gibbon Street <br /> did not occur until the Iguana Street area was developed. He suggested instead that perhaps the <br /> Iguana Street area be routed in the other direction rather than routing their water towards Gibbon <br /> Street. <br /> Cassandra Miske, 17421 Gibbon Street NW, confirmed that there is a culvert that drains into the <br /> ditch in their yard. She stated that it appears that their yard is the end spot for drainage and that <br /> is why she believes they have flooding of their yard. She questioned if the capacity of the ponds <br /> in the area could be increased. <br /> Public Works Committee/March 31, 2015 <br /> Page 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.