My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Public Works Committee - 03/31/2015
Ramsey
>
Public
>
Minutes
>
Public Works Committee
>
2010 - 2019
>
2015
>
Minutes - Public Works Committee - 03/31/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:25:41 PM
Creation date
6/1/2015 8:52:45 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Public Works Committee
Document Date
03/31/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember Johns confirmed that a retention pond would be investigated as a possible <br /> solution. <br /> Mr. Miske stated that the cheaper solution may be to demolish the existing homes and rebuild. <br /> City Engineer Westby stated that this item will be brought back on May 19th. <br /> Civil Engineer II Linton provided a brief overview of the other two areas of flooding concern <br /> identified within the case, noting that the issues are less severe and the potential solutions would <br /> be costly. <br /> City Engineer Westby stated that staff has spoken with neighboring cities but they do not have <br /> the same problems because they have more relief and elevation differential. <br /> 5.02: Consider the Surface Water Management Plan Update <br /> Civil Engineer II Linton reviewed the staff report and briefly summarized the results of the pipe <br /> and pond summary. <br /> City Engineer Westby stated that City Administrator Ulrich could not attend this evening but had <br /> asked if there were any cost implications related to the updating of the Surface Water <br /> Management Plan. He stated there are no new mandates that will increase costs significantly, <br /> but incorporating the Atlas 14 stormwater data will have an impact on future costs as projects <br /> will be designed to a higher standard. <br /> Motion by Councilmember Johns, seconded by Councilmember Shryock, to approve the updated <br /> Surface Water Management Plan and forward it to the City Council for approval. <br /> Motion carried. Voting Yes: Chairperson Riley, Councilmembers Johns and Shryock. Voting <br /> No: None. <br /> 5.03: Consider Use of Sunwood Drive as Official Detour Route During Highway 10 and <br /> Armstrong Boulevard Interchange Construction <br /> City Engineer Westby reviewed the staff report and stated that bids on the Armstrong <br /> Interchange project were opened today and that construction will likely begin in early May and <br /> take one year to complete since Armstrong Boulevard will be closed between Sunwood Drive <br /> and Riverdale Drive. He reviewed the detour plan as bid with the project, which identifies <br /> Bunker Lake Boulevard as the official detour route between Armstrong Boulevard and Ramsey <br /> Boulevard. He stated the purpose of this case is to determine if there is interest in requesting that <br /> the official detour be changed from Bunker Lake Boulevard to Sunwood Drive. He explained <br /> that usually the County prefers to use County Roads for detours. He stated that staff asked the <br /> County if they would consider changing the detour route and were advised that they might <br /> consider such a request if submitted in writing. He noted that if approved by the County there <br /> may be additional conditions, such as a damage claim waiver. He stated that there would not be <br /> Public Works Committee/March 31, 2015 <br /> Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.