Laserfiche WebLink
FINAL PAY ESTIMATE NO. 2 <br /> <br />Date: <br />Improvement Project: <br /> <br />Contractor: <br />Current Contract Amount: <br />Award Date: <br /> <br />November 17, 1993 <br />g92-19, 149th Lane Sewer, Water, Storm Sewer and <br />Street Construction <br />Bonine Excavating, Inc., Etk River, MN 55330 <br />$64,503 (Includes C.O. #1 to I.P.g92-19) <br />March 23, 1993 <br /> <br />The following work has been completed on the above referenced project: <br /> <br /> Item Quantity Unit <br /> Used Price <br />Schedule A - Sanitary Sewer <br /> <br />8" Sanitary Sewer 0 - 10 dp <br />8" Sanitary Sewer 10-12 dp <br />8" Sanitary Sewer 12-14 dp <br />8" Sanitary Sewer 14-16 dp <br />8" Sanitary Sewer 16-18 dp <br />48" diameter manhole 0 - 8 dp <br />Excess manhole > 8' dp <br />Service connector riser <br />4" PVC service pipe <br />8 x 4 Service wye <br /> Subtotal Schedule A: <br /> <br />160 ft. 8/ft. <br />218 ft. 9/ft. <br />63 ft. 10/ft. <br />39 ft. 11/ft. <br />143 ft. 12/ft. <br />3 ea. 965/ea. <br />9.93 ft. 68/ft. <br />7 ea. 90/ea. <br />533 ft. 6/ft. <br />15 ea. 22/ea. <br /> <br />Extension <br /> <br />1,280.00 <br />t,962.00 <br />630.00 <br />429.00 <br />1,716.00 <br />2,895.00 <br />675.24 <br />630.00 <br />3,198.00 <br />330.00 <br />$13,745.24 <br /> <br />Schedule B - Watenmfin <br /> <br />12" DIP Ci 50 <br />6" DIP C1 52 <br />1" Copper service <br />12" Gate valve <br />6" Gate (salvage & reset) <br />6" Gate <br />1" Corporation stop <br />1" Curb stop <br />Hydrant <br />Ductile iron fittings <br /> Subtotal Schedule B: <br /> <br />255 ft. 16/ft. <br />610 ft. 10/ft. <br />525 ft. 7/ft. <br />2 ea. 737/ea. <br />1 ea. 302/ea. <br />1 ea. 302/ea. <br />15 ea. 16/ea. <br />15 ea. 61/ea. <br />1 ea. 990/ea. <br />665 lb. 0.81/lb. <br /> <br />4,080.00 <br />6,100.00 <br />3,675.00 <br />1,474.00 <br />302.00 <br />302.00 <br />240.00 <br />915.00 <br />990.00 <br />538.65 <br />$18,6t6.65 <br /> <br />Schedule C - Street Improvements <br /> <br />Subgrade preparation <br />Class V aggregate <br />Bituminous Type 41 <br />Surmountable curb & gutter <br />Turf establishment <br /> Subtotal Schedule C: <br /> <br /> 7 RS 76.50/RS <br />578.5 tn. 5.81/tn. <br />339.1 tn. 22.19/tn. <br />1,448 ft. 4.39/ft. <br />0.8 acre 970/acre <br /> <br />535.50 <br />3,360.79 <br />7,523.96 <br />6,356.72 <br />776.00 <br />$18,552.97 <br /> <br />I <br />I <br />t <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />