Laserfiche WebLink
8. Drainage Plan <br /> <br />o <br /> <br />Drainage from the facility and associated paved roadways, <br /> ~=c~ed to two <br />storage areas and parking areas will be ~-- ~ <br />sedimentation basins. %he first basin is located <br />approximately I00' east of the facility. The second basin is <br />located approximately 500'n~r~w=s~- ~ .... of the facility. Both <br /> ~- site map and are sized such ~-t ~e <br />basins are shown oD ~ =~ ~ <br />IPS facility will use only a small fraction of there capacity <br />with the remaining capacity used for landfill runoff. <br /> <br />~ccess to~m~ue <br /> <br />Access %o the compost facility will be off Sunfish Lake blvd. <br />using ~-~= existing entrance to the Anoka Landfill. A paved <br />access road will then lead from the landfill entrance to ~ <br />facil~ <br /> ~y as shown on the site map in Attachmemt I. <br /> <br />Garbage Contazner .... "-- <br /> <br />II. <br /> <br />12. <br /> <br />A garba~= ~ntainer will be located ~, ~e north side of =~ <br />bui~ ~ _~ <br /> ~=~,, ~==~! on all <br /> ===,,~. This location "~=~ ~ ~ be screened = ..... ~- <br />sides ~" ~-~= ~"~ ...... ~= ~-~ ..... wall~ ~ ' ~--~=~1. <br /> <br />' ' - ....... Proposed Materlals <br /> <br />bays and <br />roadways <br /> <br /> artists rendition of a faci~'~'' ~--- ' ' ' <br /> ~y ~ted i~ Trenton, O~tarlo <br /> <br />~===~=~~ ...... = ~ ~ be seen on the site plan <br /> <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br /> ! <br /> I <br /> I <br /> I <br /> ! <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> <br /> <br />