Laserfiche WebLink
5ƩğŅƷ CźƩĻ {ƷğƷźƚƓ ϔЋ tƩƚƆĻĭƷ .ǒķŭĻƷ <br />/ƚƓƭƷƩǒĭƷźƚƓ /ƚƭƷƭ <br />Construction$ 3,180,000.00 <br />Data / Telecom wiring $ 50,000.00 <br />Construction contingency$ 160,000.00 <br />Total Construction Costs$ 3,390,000.00 <br />{ƚŅƷ /ƚƭƷƭ <br />A/E Fees$ 171,000.00 <br />Additional CA, weekly meetings and field reports $ 16,000.00 <br />Reimbursable Expenses$ 6,000.00 <br />FF&E (Furniture, Fixtures and equipment) $ 160,000.00 <br />SAC / WAC (sewer and water connection fees)$ 30,000.00 <br />Plan review fee$ 15,000.00 <br />Testing (construction)$ 70,000.00 <br />Bid document printing $ 60,000.00 <br />General Project Contingency $ 50,000.00 <br />Total Soft Costs$ 578,000.00 <br />{ǒĬ ƚƷğƌυ ЌͲВЏБͲЉЉЉ͵ЉЉ <br />CźƓğƓĭźƓŭ /ƚƭƷƭ <br />ΛƷƚ ĬĻ ǒƦķğƷĻķͲ ƓƚƷ ŅźƓğƌΜ <br />Capitalized Interest 2015$ 175,000.00 <br />Debt Issuance Costs$ 11,000.00 <br />Other$ 296.25 <br />Total Financing Costs$ 186,296.25 <br />ƚƷğƌ tƩƚƆĻĭƷ /ƚƭƷƭυ ЍͲЊЎЍͲЋВЏ͵ЋЎ <br />ŷźƭ źƭ ƷŷĻ ğƒƚǒƓƷ ƷŷĻ /źƷǤ Ǟƚǒƌķ ĬƚƓķ͵ <br /> <br />