My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/13/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 01/13/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:59:08 PM
Creation date
6/10/2015 2:18:03 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/13/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
595
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File Location: Pbrama>HDrive>LegislativeInitiatives>2015 <br />(1) Implementation of U.S. Highway 10 Access Planning Study Projects* <br /> <br />ISSUE: Highway 10 is a principal arterial roadway providing a significant transportation connections from <br />Minneapolis St. Paul to the northwest suburbs and Greater Minnesota. The 4-lane roadway <br />(Anoka/Sherburne County line to the Rum River in Anoka) carries average daily traffic volumes ranging from <br />33,500 to 61,000 vehicles per day. <br /> <br />This corridor is commonly congested and has much higher than average crash and crash severity rates than <br />comparable corridors. In addition, the corridor has five signalized intersections and numerous direct access <br />points (14.5 per mile); which contribute to the degradation of the U.S. Highway 10. Over the past ten (10) <br />years, thirteen (13) people have died in crashes on this 7-mile corridor. Four (4) fatalities were pedestrians; <br />including (3) from 2013 to 2014. <br /> <br />Highway 10 has been studied numerous times over the past decade, each time a full-freeway status was <br />identified as the ultimate solution. However, due to limited funding opportunities at the State and Federal <br />level, full-freeway status would be difficult to achieve within the next 20 years. <br /> <br />As a result of funding constraints, MnDOT and Bolton & Menk completed a study to achieve freeway-like <br />status for U.S. Highway 10 in the fall of 2014. This study is known as: The U.S. Highway 10 Access Planning <br />Study. This study achieves 90% of the safety and operational benefits of a full-freeway for 50% of the cost. <br />The intent of this study is to identify high-benefit improvements that are fiscally responsible so that <br />improvements can be funded, programmed, and implemented incrementally. This study has been formally <br />adopted by MnDOT, Anoka County, the City of Anoka and the City of Ramsey. <br /> <br />Information Source: www.dot.state.mn.us/metro/projects/hwy10study/ <br /> <br />RECOMMENDATION: Included in the U.S. Highway 10 Access Planning Study is a recommended, prioritized, <br />list of improvement projects. The City of Ramsey recommends State and Federal funding sources be <br />secured -. <br /> <br />>Topic Generally Supported by: MnDOT, Anoka County, City of Anoka <br />legislative initiative. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />2014 City of Ramsey Legislative Platform Page 3 of 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.