Laserfiche WebLink
7.CONCLUSIONS AND RECOMMENDATIONS <br />City Project No. 13-10is proposed to consist of reconstructing the bituminous pavement sections <br />andcompleting other appurtenant work onthe following street segments: <br />Garnet Street (approx. 1,350 linear feet) -167th Street tonorth plat line Now & Then Estates <br />168th Avenue (approx. 670 linear feet) -Garnet Street to west cul-de-sac <br />It is the recommendation of City staff that City Project No. 13-10is feasible, necessary, and cost- <br />effective from an engineering standpoint. <br />The following staff recommendations related to the proposed project are presented forCouncil <br />considerationand concurrence: <br />1.Staffrecommends constructing new sidewalks within City right-of-ways along the east <br />th <br />side of Garnet Street and the north side of 168Avenue at 100% city cost. <br />2.Staff recommends correcting the subgrade soils by excavating 3 feet of existing subgrade <br />and replacing it with cleanimported select granular material at 100% city cost. <br />3.Staff recommends constructing new bituminous pavement per the City’s standard <br />residential pavement section of 4” aggregate base class 5, 2” bituminous base course, and <br />1½” bituminous wear course. <br />4.Staff recommends constructing 8”DIP watermainunder both street segments at 100% <br />city cost. <br />5.Staff recommends ordering an assessment appraisal consultation to ensure that special <br />assessments do not exceed the benefit received as a result ofthe improvements. <br />6.Staff recommends holding aneighborhood information meeting on January 29, 2015. <br />The City Council is asked to act on the following items relatedto the proposed project: <br />1.Accept the preliminary residential special assessment rate of $6,500 per lot. <br />2.Authorize an assessment appraisal consultation to ensure that all special assessments are <br />commensurate with benefit received from the proposed improvements. <br />3.Adopt Resolution #15-01-018 approving this Feasibility Report and ordering the Public <br />Hearing for February 10, 2015. <br />Feasibility Report <br />th <br />Garnet Street and 168Avenue Reconstruction <br />City of RamseyProject No. 13-10 <br />Page 19 <br /> <br />