Laserfiche WebLink
PRELIMINARY ENGINEER'S ESTIMATE Prepared by: Bruce Westby, P.E. <br />Proposed Construction Year: 2015 <br />168th AVENUE RECONSTRUCTION (670 LF) <br />NOW THEN ESTATES <br />CITY OF RAMSEY <br />JANUARY 8, 2015 <br />SCHEDULE A: STREET CONSTRUCTION <br />ESTIMATEDCONTINGENTEST. UNITESTIMATED <br />QUANTITY <br />DESCRIPTIONQUANTITYUNITPRICEAMOUNT <br />MOBILIZATION0.330LS <br />$25,000.00$8,250.00 <br />REMOVE CURB AND GUTTER00LFNEW <br />$10.00$0.00 <br />REMOVE BIT. CURB & PAVEMENT2,4570SY <br />$8.00$19,653.33 <br />REMOVE 15" CMP00LF <br />$15.00$0.00 <br />SAWCUT BIT. PAVEMENT00LF <br />$6.00$0.00 <br />SAWCUT CONCRETE PAVEMENT600LF <br />$8.00$480.00 <br />REMOVE BIT. DRIVEWAY00SY <br />$7.00$0.00 <br />REMOVE CONCRETE DRIVEWAY/APRON1,320120SF <br />$12.00$15,840.00 <br />COMMON EXCAVATION (CV)90053CY <br />$8.00$7,198.44 <br />SUBGRADE EXCAVATION, REMOVE UNSUITABLE MATL (CV)3,050296CY <br />$9.00$27,454.00 <br />HAUL AND DISPOSE EXCESS MATERIAL (CV)3,050296CY <br />$10.00$30,504.44 <br />SELECT TOPSOIL BORROW (4") (CV)17021CY <br />$30.00$5,096.67 <br />SELECT GRANULAR BORROW (36") (CV)3,225421CY <br />$12.00$38,700.89 <br />AGGREGATE BASE - CLASS 5 MOD. (4") (CV)35047CY <br />$7.00$2,449.74 <br />BITUMINOUS TACK COAT13022GAL <br />$4.00$519.78 <br />BITUMINOUS BASE COURSE (LVNW35030B) (2")28548TON <br />$68.00$19,412.49 <br />BITUMINOUS WEAR COURSE(MVWE35035C) (1.5")21537TON <br />$75.00$16,133.13 <br />BIT. DRIVEWAY REPAIR/PATCH00SY <br />$8.00$0.00 <br />6" CONCRETE DRIVEWAY/APRON1,320120SF <br />$6.00$7,920.00 <br />CONCRETE SIDEWALK (6')4,0200SFNEW <br />$4.00$16,080.00 <br />PEDESTRIAN CURB RAMP10EANEW <br />$1,500.00$1,500.00 <br />CONCRETE CURB AND GUTTER DESIGN - TYPE B6181,450110LF <br />$18.00$26,100.00 <br />RELOCATE MAIL BOX/SUPPORT40EANEW <br />$450.00$1,800.00 <br />ADJUST MH20EA <br />$500.00$1,000.00 <br />ADJUST VALVE CASTING20EA <br />$250.00$500.00 <br />SILT FENCE, TYPE MACHINE SLICED1,0050LF <br />$2.50$2,512.50 <br />SOD1,475135SY <br />$3.50$5,162.50 <br />TRAFFIC CONTROL0.330LS <br />$8,000.00$2,640.00 <br />TOTAL STREET CONSTRUCTION:$256,907.91 <br />SCHEDULE B: STORM SEWER <br />6" DRAIN TILE4000LF <br />$6.00$2,400.00 <br />15" RCP STORM SEWER4600LF <br />$28.00$12,880.00 <br />21" RCP STORM SEWER00LF <br />$40.00$0.00 <br />21" RCP APRON00EACH <br />$1,200.00$0.00 <br />2' x 3' CATCHBASIN (INCL CASTING)20EACH <br />$2,000.00$4,000.00 <br />48" CATCHBASIN (INCL CASTING)20EACH <br />$2,500.00$5,000.00 <br />DRAINAGE IMPROVEMENTS (DITCH/POND)0.330LSNEW <br />$40,000.00$13,200.00 <br />TOTAL STORM SEWER CONSTRUCTION$37,480.00 <br />H:\\Cases\\CC\\2015\\1-13-15\\Garnet&168thAve Engrs Est Feas Rpt FINAL PDFPage 4 of 6 <br /> <br />