Laserfiche WebLink
PRELIMINARY ENGINEER'S ESTIMATE Prepared by: Bruce Westby, P.E. <br />Proposed Construction Year: 2015 <br />168th AVENUE RECONSTRUCTION (670 LF) <br />NOW THEN ESTATES <br />CITY OF RAMSEY <br />JANUARY 8, 2015 <br />CONNECT TO EXISTING WM10EACH <br />$1,250.00$1,250.00 <br />TOTAL WATERMAIN CONSTRUCTION$70,750.00 <br />SUMMARY OF STREET RECONSTRUCTION WITH UTILITIES <br />TOTAL STREET CONSTRUCTION$256,907.91 <br />TOTAL STORM SEWER CONSTRUCTION$37,480.00 <br />TOTAL SANITARY SEWER CONSTRUCTION$33,405.00 <br />TOTAL WATERMAIN CONSTRUCTION$70,750.00 <br />10% CONTINGENCY$39,854.29 <br />ENGINEERING (18%) ADMINISTRATIVE AND LEGAL (7%)$109,599.30 <br />TOTAL ESTIMATED PROJECT COST$547,996.50 <br />H:\\Cases\\CC\\2015\\1-13-15\\Garnet&168thAve Engrs Est Feas Rpt FINAL PDFPage 6 of 6 <br /> <br />