My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 04/14/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:03:34 PM
Creation date
6/11/2015 8:06:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fire Station #2 <br />Questions <br />How does the new proposed Fire Station #2 compare to the City's existing Fire Station #1? Is <br />the proposal for Fire Station #2 excessive? Is the new Fire Station #2 a need versus a want? <br />The City of Ramsey Fire Department currently operates as a paid -on-call service structure. The <br />City does not employ full time firefighters (excluding the Fire Chief and Fire Marshal). The City <br />does not intend to deviate from this model now or into the future. <br />When the City completed a space needs analysis in 2006, and a preliminary design in 2013, the <br />new proposed Fire Station #2 was designed as a paid -on-call station. As a result, Fire Station #2 <br />does not include additional space for full-time firefighters (i.e. sleeping space, etc.). <br />What is unique about the station is the inclusion of a satellite location for the City's Police <br />Department and a satellite location for an Allina Emergency Ambulance. Inclusion of both <br />services will reduce emergency response times and the increase effectiveness/efficiency of the <br />City's police services to greater Ramsey (i.e. eliminate the need for Police Officers to drive back <br />to City Hall routinely). <br />Additionally, the Fire Station #2 will serve as the "back-up" Emergency Operations Center (EOC) <br />for the City of Ramsey. This proposed station includes a small conference room (for EOC <br />purposes); and will also be available for use by the community (non-profit groups and residents). <br />The conference room in Fire Station #2 is smaller than Fire Station #1. <br />Attached to this case is a "comparison" of Fire Station #1 and the new proposed Fire Station #2. <br />It should be noted: based on the 2006 space needs analysis for Fire Station #2, it was <br />determined, utilizing the existing municipal center site was not a feasible or practical long term <br />solution. Fire Station #2 was designed to be "right -sized" and an efficient facility. It is built to <br />effectively deliver the service needs of the community now and into the future. <br />Why was construction administration increased from preliminary design to final design? How <br />will this benefit the City? <br />Staff has requested additional oversight of this project by BKV Group to ensure quality <br />construction of a multi-million dollar permanent/prominent community facility, <br />to increase efficiencies of the construction process, to improve communications during <br />construction between staff -general contractor -architect -City Council, increase oversight of <br />general contractor, and to attempt reducing/eliminating construction issues. More specifically, <br />BKV Groups' site visits and communications to City staff will be doubled from 1x every two <br />weeks to 1x every week. The original proposal by BKV Group was $34,000. The adjusted <br />(increased) price for this service is now $50,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.