My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 04/14/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:03:34 PM
Creation date
6/11/2015 8:06:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comparison Overview <br />Fire Station #1 and Fire Station #2 <br />STAFF COMMENTS: <br />SIMILARITIES <br />• Both will have the ability to act independently in the event of an emergency. <br />• Both will include the following general components: <br />o Fire Engine <br />o Tanker/Tender Truck <br />o Grass Truck <br />o Rescue Truck <br />o Hose Tower <br />The purpose of a hose tower is to allow space for equipment (mainly fire hoses) to properly dry out after use. Not <br />properly drying hoses causes mold build up and faster decay of hose cloth. Not having a hose tower at each location will <br />result in higher personnel costs and operational inefficiencies (in comparison to having separate towers). Hose towers <br />are standard for all modern fire department facilities. <br />DIFFERENCES <br />• Fire Station #1 <br />o Designed as center point of all Fire Department operations and training (for all three stations) <br />o Includes a large training space/conference room and a large/full sized kitchen <br />o Includes significant office space for Fire Chief, Marshal and future staff. <br />o Includes a water rescue unit/boat. <br />o Includes 2 full bays. <br />• Fire Station #2 <br />o Not designed as center point of all Fire Department operations and training. <br />o Includes a satellite police office and garage stall for a squad car (reduce PD response times). <br />o Includes a satellite Allina ambulance garage stall (reduce response times). <br />o Small kitchen, small training room, small office space. <br />o Includes ladder truck. <br />o Includes 3 full bays. <br />BKV COMMENTS: <br />Ramsey Fire Station No. 2 Space Needs Program <br />COMMISSION NO 1437.01 <br />August 1, 2014 <br />Proposed Station No. 2 <br />Existing Station No. 1 <br />prepared by BKV Group <br />comments <br />Areas are net interior square footage <br />Office 1 Training Areas <br />Trainrig Room <br />700 <br />540 <br />area includes storage <br />Living Areas <br />Kitc'len 1 Dayroorn <br />300 <br />364 <br />Apparatus Bays <br />Apparatus Bays <br />4800 <br />3,338 <br />Existing station is equivalent to approximately 2 full bays, <br />the proposed station is 3 bays <br />Apparatus Bay Support <br />Tsrrcijt Gear.Area <br />Hose To,,.,e- <br />386 <br />160 <br />375 <br />168 <br />
The URL can be used to link to this page
Your browser does not support the video tag.