My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 04/14/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:03:34 PM
Creation date
6/11/2015 8:06:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cur Upsilon.: To wort together to reapotidly grow OW community, and to provide quality, cost-effective, and efliel.ent government services. <br />CC Regular Session 4. 6. <br />Meeting Date: 04/14/2015 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution 15-04-094 Approving Plans and Cost Estimate and Awarding a Contract to Connexus Energy for <br />Center Street lighting improvements, Improvement Project #14-24 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to approve proposed street and pedestrian facility lighting plans for Center Street <br />between Sunwood Drive and Ramsey Parkway. <br />Background: <br />Street and pedestrian facility lighting improvements were not bid with the Center Street Improvements project <br />between Sunwood Drive and Ramsey Boulevard. Center Street is located immediately adjacent to a proposed City <br />park and includes numerous on -street parking stalls that will be available for use by future park patrons. In addition, <br />a regional pedestrian trail is located along the west side of Center Street. Therefore, staff believes street and <br />pedestrian facility lighting is appropriate for this segment of Center Street and has worked with Connexus Energy <br />to develop the attached proposed street and pedestrian facility lighting plan. <br />Connexus Energy's proposed design includes a combination of four (4) street lights at the intersection of Center <br />Street and 145th Avenue NW with 135 watt LED shoebox style light fixtures mounted on 25 -foot tall poles that <br />match the COR lighting standards as installed along Sunwood Drive, and ten (10) 50 watt LED lights on 14 -foot <br />tall poles that again match the COR lighting standards. <br />The proposed design provides lighting levels along Center Street that will be similar to the lighting levels along <br />Sunwood Drive. The proposed lighting system will be operational from dusk to dawn. <br />The City of Ramsey works exclusively with Connexus Energy to construct and maintain public street and trail <br />lighting improvements throughout most of the City, including the COR. No other bids or quotes were therefore <br />obtained. Attached is a copy of Connexus Energy's estimated costs for the proposed street and pedestrian facility <br />lighting improvements in the amount of $48,892.18. If directional boring is required an additional per linear foot of <br />boring will be charged. <br />If approved, Connexus Energy would install the lighting improvements in spring/summer of 2015. Ideally, all <br />underground work (wiring and pole bases) would be completed in conjunction with the completion of the Center <br />Street improvements project, and the above ground work (poles and fixtures) would follow based on material <br />delivery schedules, which may take two months or more due to the use of COR lighting standards. Connexus <br />Energy will provide on-going maintenance of the lights under their current monthly energy and maintenance rates. <br />Conduits for street and pedestrian facility lighting were installed under driveways and streets during the Center <br />
The URL can be used to link to this page
Your browser does not support the video tag.