My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/14/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 04/14/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:03:34 PM
Creation date
6/11/2015 8:06:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/14/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"• CONNEXUS" <br />ENERGY <br />Your Community Energy Partner <br />Bruce Westby <br />City of Ramsey <br />7550 Sunwood Dr NW <br />Ramsey, MN 55303 <br />Mr. Westby, <br />14601 Ramsey Boulevard <br />Ramsey, Minnesota 55303 <br />763-323-2600 <br />Fax: 763-506-9541 <br />1-800-642-1672 <br />www.connexusenergy.com <br />info@connexusenergy.com <br />March 26, 2015 <br />We have prepared the following preliminary layout and costs to install street lighting and <br />pedestrian lighting along Riverdale Dr. from Armstrong to Traprock. Connexus Energy <br />would install, retain ownership, and provide ongoing maintenance of the lights under our <br />monthly energy and maintenance rate. <br />Roadway Fixtures <br />(27) 135 Watt LED Shoebox style lights on 30' fiberglass poles <br />(1) Small Lighting Control Cabinet <br />(8,250 feet) wire footage (estimated) <br />(230 feet) bore footage (estimated) <br />Total for roadway fixtures <br />at $2,592 each <br />at $2,280 <br />at $6.65/foot <br />at $9.90/foot <br />$129,403.50 <br />Pedestrian Fixtures <br />Traditionaire style LED lights on 14' fiberglass poles at $1,351 each <br />(272 feet north side, 396 feet south side) Additional footage at $6.65/foot <br />South side trail — 14 lights $21,547.40 <br />North side trail — 13 lights $19,371.80 <br />Permit administration fee (assumes Ramsey fee waived) $25 <br />The above estimate assumes installation at the same time. The exact amount of <br />directional boring required unknown. Necessary directional boring will be charged at an <br />additional $9.90 per foot. All footage fees will be updated on installed measurements. <br />The lights will be installed to utility specifications, will be unmetered, and will operate on <br />a dusk -to -dawn schedule. If job site conditions beyond our control prevent normal <br />installation procedures or if winter construction is required, additional charges may be <br />applied. Although care will be taken to allow for minimal restoration, Connexus Energy <br />will not be responsible for final restoration of groomed turf. <br />Sincerely, <br />Dan Johnson <br />Distribution Designer <br />
The URL can be used to link to this page
Your browser does not support the video tag.