My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/28/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 04/28/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:03:54 PM
Creation date
6/11/2015 8:19:15 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/28/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
651
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: BROOKFIELD 6TH ADDITION. <br />Major Plat Final Plat Request <br />Comprehensive Plan and Zoning Code Review <br />Page 2 of 5 <br />Setbacks <br />Re • uired: <br />Front ard: 30 feet <br />Side ard uninhabitable: 6 feet <br />Side ard habitable: 10 feet <br />Side ard corner: 30 feet <br />Proposed: <br />30 feet <br />6 feet <br />10 feet <br />Rear ard: 30 feet <br />Minimum lot width: 80 feet/corner lot 90 feet <br />30 feet <br />30 feet <br />80 feet/90 feet <br />*Note.. Minimum Lot Width is measured at front yard setback (30 feet from front property line), not front property line, nor at curb line. <br />Building Elevations: No elevations of the proposed homes were submitted. Individual models are not <br />included for review. In a single family development, it is difficult to approve every individual potential <br />model at time of Plat. As with the original Preliminary Plat, no enhanced architecture above the minimum <br />City Code requirements of Section 117-111 (R-1 Residential District) is being proposed. The required <br />Development Agreement shall clearly state that additional architectural requirements are not being required <br />at this time, and that the underlying requirements for the R-1 Residential (MUSA) District are required. <br />Streets: All proposed streets (168th Ave NW and Kamacite St NW) appear to meet the 60 foot width <br />minimum. This phase (Brookfield 6' Addition) will result in the connection to the existing 168th Ave cul- <br />de-sac at the eastern boundary of the plat. This section of street is expected to be reconstructed this summer <br />(2015) and coordination with the City to ensure a seamless transition from the existing (reconstructed) <br />segment of 168' Ave NW to the proposed new segment of 168' Ave NW. The Plans indicate a temporary <br />cul-de-sac being constructed at the east end of 168th Ave. It is our understanding that the applicant has <br />had discussions with our Engineering Staff regarding coordination of the City's street reconstruction <br />project and this proposed project. Note that a temporary cul-de-sac will not be permitted and the final <br />construction plans shall be revised to clearly articulate the connection of 1 68th Avenue. Please review the <br />Engineering Technical Report for additional details. <br />Sidewalks are proposed on one side of each public street in accordance with City Code. <br />Development Fee Calculations: <br />Development Fees due on the Plat are outlined in the DRAFT Development Agreement. Detailed analysis <br />on unique provisions of development fees related to this plat are outlined below. <br />Park Dedication and Trail Development Fees: Park Dedication and Trail Development Fees shall be due <br />on the Plat. These fees are collected at the time the Final Plat is recorded at the rate in effect the plat is <br />recorded. At this time, Staff recommends that a cash contribution be used to satisfy both Park Dedication <br />and Trail Development Fee Requirements. It is further recommended that the Park Dedication be utilized <br />to make the trail connection along Trott Brook to Variolite Street to the west. There is an existing storm <br />water easement on Outlot C, Brookfield 3' Addition that could be expanded as a trail easement to provide <br />a public trail connection from 170' Trail. This connection would be a nice addition for the existing <br />Brookfield residents and this new 6' Addition, consistent with the City's current Master Park and Trail <br />plan. The exact timing and level of construction will be dependent upon the number of lots created with the <br />Final Plat and an estimate of the cost to extend and connect the trail. It is further noted that 21" Century <br />Bank has conceptually agreed to convey necessary trail easements and fee -title to areas to make additional <br />connections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.