My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/28/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 04/28/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:03:54 PM
Creation date
6/11/2015 8:19:15 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/28/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
651
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the CITY determines that the Plat does not comply, the CITY may, at its <br />option, refuse to allow any construction or development work in the Plat <br />until the PERMITTEE does comply. Upon the CITY'S demand <br />PERMITTEE shall cease work until there is compliance. <br />d. Mailbox Locations. If the PERMITTEE desires to construct mailboxes <br />within the public right of way, the PERMITTEE agrees that the placement <br />of mailboxes along public streets is subject to the approval by the CITY. <br />Utility locates will be necessary. <br />e. Boulevard and Wetland Restoration. The PERMITTEE shall be <br />responsible for the cost of establishing seed in all boulevards within thirty <br />(30) days of the completion of the street improvements, and restoring all <br />other areas disturbed by the development grading operation in accordance <br />with the approved Grading and Erosion Control plan. The PERMITTEE <br />shall be responsible for the cost of cleaning any soil, earth, or debris from <br />the wetlands within and adjacent to this Plat resulting from grading <br />performed in the development of the Plat. <br />f. Construction, Hours and Entrance Signs. The CITY restricts construction <br />and delivery hours to Monday through Saturday 7:00 a.m. to 10:00 p.m. <br />The PERMITTEE is required to provide a sign at each entrance point <br />stating delivery and construction operation hours. Said signs are not to <br />exceed eighty (80) square feet in size and must be clearly visible at all times <br />during the construction period. To the extent possible, the PERMITTEE <br />shall avoid the use of Garnet Street and 168th Avenue for construction <br />traffic. <br />g. <br />Construction Site Maintenance. The PERMITTEE shall adhere to all of <br />the CITY ordinances relating to, but not limited to, dumping of garbage, <br />site development, construction debris, open burning, etc. The CITY <br />reserves the right to withhold permits, inspections, or certificates of <br />occupancy to correct violations relating to construction site maintenance. <br />h. Estimated Cost. It is understood and agreed that cost amounts set forth in <br />this Agreement as to Stage I and Stage II Improvements, unless qualified as <br />fixed amounts, are estimated. The PERMITTEE agree to pay the entire <br />cost of said improvements including interest, engineering and legal fees <br />related thereto. <br />
The URL can be used to link to this page
Your browser does not support the video tag.