Laserfiche WebLink
Review File: Sunwood Village <br />Site Plan Review: Comprehensive Plan and Zoning Code <br />April 3, 2015 <br />Page 6 of 12 <br />Easements/Agreements: Based on the submitted Site Plan, multiple easements/agreements will be <br />necessary. A Reciprocal Driveway Easement appears to be in place for this lot and Lot 3 Block 1 <br />COR ONE. An Encroachment Agreement with the owner of Lot 3 Block 1 COR ONE may be <br />necessary for the proposed Tot Lot if any improvements (land disturbance) for it will encroach onto <br />the adjacent property, as shown on multiple sheets. Alternatively, the improvements could be shifted <br />west so they are entirely on the Sunwood Village parcel. Additionally, a Temporary Construction <br />Easement will also be necessary, again from the owner of Lot 3 Block 1 COR ONE, for some of the <br />improvements shown on Sheet C1-2. Finally, the applicant must verify whether the existing <br />Reciprocal Driveway Easement is sufficient for the access lane leading to the eastern wall of the <br />building. Note that all easements must be recorded prior to the City issuing a Building Permit and the applicant must <br />provide proof of recording of all documents as required by the City. A title search should be completed to ensure that all <br />underlying easements are vacated as necessary. Vacating easements is a separate Land Use Application with the City. <br />Development Fees: The project will be subject to applicable development fees including, but not <br />necessarily limited to, Park Dedication, Trail Development, Stormwater Management, Water and <br />Sanitary Sewer Trunk Fees. A full analysis of the Development Fees can be found in Exhibit B. Note <br />that a detailed Engineer's Cost Estimate for all improvements (excluding the building) must be submitted to calculate <br />the required Surety and Inspection Fees. The estimate should be broken down by line item and include quantities and <br />unit costs. <br />Recommendation: City Staff is recommending that the City Council adopt Resolutions #15-04-088 <br />and #15-04-089 approving the Final Plat and Site Plan for Sunwood Village, with amendments as <br />outlined in this Staff Review File. <br />Next Steps. Following Planning Commission Review, the Site Plan and Final Plat will be forwarded <br />to City Council for consideration. Review by the City Council could tentatively occur at the April 28, <br />2015 City Council meeting. <br />