Laserfiche WebLink
Review File: Sunwood Village <br />Site Plan Review: Comprehensive Plan and Zoning Code <br />April 3, 2015 <br />Page 12 of 12 <br />Exhibit B (Development Fees) <br />City of Ramsey <br />2O2 Residential Development Fee Calculator <br />lions <br />Unit Type <br />I.'nlr Prkre Total <br />ants <br />Park ouch= tan end Tra U oevrdapmnnt <br />Park Dedication <br />0• e3ll11Llo Iier Arte; or <br />1,7-19 I logs par :we; or <br />20r Units per acre, or <br />Assisted Lhklng. <br />Trail DPVelopmo 1I <br />u <br />O <br />-17 <br />47 <br />pot 400 <br />per unit <br />per unit <br />per acre <br />per unit <br />57600 SO <br />7405 SO 7.5%6 Drnslty Souris <br />57240 5103,570 ISY. Density Bonus <br />59,1.18 SO <br />S700 5379O0 <br />Nabrntnl Pok and Trail Oreederpmrnr <br />Styr 770 <br />Water and Sewer Fees <br />Collet led prior to 1cKUI11)117p1a1. <br />Water Pees <br />Trdnk/C:anneciiou <br />Lateral <br />Sewer Fees <br />Trunk/Co met -non <br />Lateral <br />Subtotal Trunk end f,Cterai <br />Colltwnedwith individual butdwa permits. <br />ArrerudhISn° Cltartes <br />Accessibility Charge (WAC) <br />Accessibility Charge ES5C) <br />am: handling Pee <br />rale L r&4mp.. orzinmini6nrovomrm <br />}7 <br />Per 11.1117 55,597 575,059 <br />per acre 56297 SO If already consen[cied <br />per min SI/26 552.92.5 <br />per arra 53.411 SO if already constructer) <br />$511,9&1 <br />47 <br />17 <br />a <br />per SAC Ord r <br />WI -MC Una <br />per address <br />met) {1, SAC!! n.t,°,,,e w an:S; <br />52.177 550..319 Collected with Building Perndt <br />5.').405 St 16.715 Collected with Stilidlog Permit <br />j,S3 to CnIk,il.l6lth Bedding Patel <br />Sods roc Ai IVrrrerand Slewep Res <br />5340,095 <br />Morn -twat ur stn nagmmnui Foos <br />S1ormetater Management <br />per unit <br />5459 521,513 <br />Mtn' STonniwuter Management <br />521.575 <br />Street Light Fees <br />An estimate nl the number or street kids required Actual mimbss will depend on -ago plan_ <br />Street Ugh Type <br />Cobra: or <br />The GOR <br />Threo E3) Years Operating and Halo mar: .r <br />3 <br />31 <br />per 1)9)11 <br />per light <br />per Unlit <br />51,300 <br />P.600 <br />5U <br />57.000 <br />5882 <br />Subtotal Street Lights <br />50402 <br />Ser ratios, and IIS3,11-0143.44ne> <br />,lnsav m ui1 kllnwti° OovPln per W1,11 need to snbmlt rams utility required Intprnvements (Stager 1 and SlaCr IIs <br />Sureties (to ensu t e con ipeetlon: rot urned when complete) <br />Subdh•tsinns/1%ail. (pulite 4Knprme.mentg) Il <br />Syte plans (prnarelmprtverueoN) <br />SubtotalSotelfx• <br />1.1.394 of tmpruvement <br />cost of l tnprnvement <br />-1C./ti <br />15754 <br />SO Cash er Letter ofCred41 <br />SO rash 9r LeiteroE7rail! <br />SO <br />C n)=lnepring inspection Fee <br />I <br />cont of improvement <br />53r, 50 rash Fscrety <br />51rb otutSurety andtiisperuun Fee <br />GRAND TOTAL FOR DEVELOPMENT FEES <br />GRAND TOTA1. FOR ENGINEERING INSPECTION FEFS <br />GRAND TOTAL FOR SURETIES <br />GRAND TOTAL FOR AC J W AC <br />5295,006 <br />50 Soparotefrom IHUIIdlogPnrmIt <br />SO <br />5172;114 Collected with Dull ding Permit <br />