Laserfiche WebLink
The SWMP was reviewed by the EPB at their March meeting. They were in general agreement with the content of <br />the SWMP. <br />The SWMP was also reviewed by the Public Works Committee at their March meeting. They were in general <br />agreement with the content of the SWMP and passed a motion to recommend City Council approval. <br />The SWMP was the subject of a Public Hearing before the Planning Commission at the April meeting with <br />particular emphasis on the recommended changes to City Code related to land use. A Public Hearing is required <br />when considering changes to City Code and any potential ordinance amendments resulting from the SWMP will <br />also be subject to the public hearing process. <br />The SWMP is being considered this evening by the City Council. <br />The SWMP will then be sent to the LRRWMO and the Metropolitan Council during the first week of May for <br />concurrent reviews. The LRRWMO has sixty (60) days to review and approve the plan, while the Metropolitan <br />Council has forty-five (45) days for review. The SWMP will then be updated as necessary after comments are <br />received and will be brought back to City Council for formal adoption. This is anticipated to be the first meeting in <br />August. <br />Observations/Alternatives: <br />The City of Ramsey is bordered on the east by the Rum River and on the south by the Mississippi River. The City <br />has many wetlands, lakes and streams within its borders. Managing the discharge of stormwater from developed <br />sites is a critical component of preserving the water quality of the wetlands, lakes, streams and rivers in and <br />adjacent to the City. The Surface Water Management Plan provides a framework for allowing development while <br />maintaining surface water quality. <br />The changes to the document include: <br />• Updating City Code references to the current system <br />• Updating the Stormwater management requirements for new construction <br />o Infiltrate first 1" of runoff from new impervious surfaces <br />o Provide rate control and water quality treatment for the 2, 10 and 100 year return events. <br />o Provide reduction for Total Suspended Solids and Total Phosphorus concentrations in stormwater <br />leaving the site. <br />o Update the reference storms to use the Atlas 14 publication. The LRRWMO adopted use of the Atlas <br />14 and required the member cities to adopt this standard. <br />• Remove references to wetland buffers for new construction. The City completed a Wetland Management <br />Plan with the 2008 SWMP. The implementation of the Wetland Management Plan was postponed by City <br />Council Action. <br />• Update the Stormwater Models to include developments constructed after 2008 and use Atlas 14 for rainfall <br />events. <br />• Update the tables and figures to include the new model results. <br />The tables and an overall map of the watersheds is attached for reference. The 10 year storm sewer capacity map <br />and 100 year pond capacity map for the D43 watershed have also been attached to the case. The descriptions of the <br />tables and maps is included in the plan. Lastly, all Council members received a CD several weeks ago that includes <br />the entire SWMP document as currently proposed. <br />Funding Source: <br />Staff has performed the update to the plan as part of their normal duties. The Stormwater Utility Fund covers part of <br />staff salaries. The plan lists Capital Improvement Projects that will need to be brought back individually for review <br />and approval. <br />Recommendation: <br />