Laserfiche WebLink
<br /> <br />a.Streets <br /> <br />b.Concrete curb and gutter <br /> <br />c.Street traffic control devices <br /> <br />d.Lot grading <br /> <br />e.Sidewalks <br /> <br />f.Boulevard sodding <br /> <br />g.Trunk and lateral sanitary sewer <br /> <br />h.Trunk and lateral water main <br /> <br />i.Storm drainage facilities <br /> <br />j.Trail development (not required) <br /> <br />k.Electricity (within one-fourth mile) <br /> <br />l.Phone (within one-fourth mile) <br /> <br />m.Natural gas (within one-fourth mile) <br /> <br />n.Water shut off boxes <br /> <br /> PERMITTEE <br />Theagrees to construct the Stage I Improvements according to the <br />terms and conditions of this Agreement and in accordance with the Plans and the <br />PERMITTEE <br />City Code. Per City Code Section 117-615, the shall provide the <br />CITY <br /> with a set of re-producible as-built plans in Computer Aided Drafting (CAD) <br />CITY <br />format upon completion of the Stage I Improvements and acceptance by the . <br />As as-built plans are a required Stage I Improvement item per City Code Section <br />CITY <br />117-615, the will not release the required Stage I Improvement Financial <br />Guarantee noted in paragraph #6 below until said as-built plans are provided to the <br />CITYPERMITTEECITY <br />. Additionally, the agrees to provide to the the plans in <br />CAD format prior to the commencement of construction of the Stage I <br /> <br />Improvements. <br /> <br />4.Additional Requirements Related to Certain Stage I Improvements. This <br /> <br />paragraph intentionally deleted. <br /> PERMITTEE <br />5.Lot Corner Staking. Themust install lot corner stakes at all lot <br /> <br />corners. <br /> PERMITTEE <br />6.Stage I Improvement Financial Guarantee. The shall provide a <br />CITY <br />financial guarantee to the guaranteeing the construction of the Stage I <br />PERMITTEE <br />Improvements and their timely completion. The shall be <br />responsible for a financial guarantee in the amount of Three Hundred Ninety Five <br />($395,853.00), <br />Thousand Eight Hundred Fifty Three Dollars and No Cents which <br />CITY <br />amount is 125% of the Engineer's estimated cost of the Stage I <br />Improvements. Upon completion of Stage I Improvements (including the removal <br />CITY <br />Plan), acceptance by the , supported by appropriate lien waivers, The <br />PERMITTEE <br /> may request a reduction in the amount of the financial guarantee. <br /> <br /> <br />