My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/12/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 05/12/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:04:18 PM
Creation date
6/11/2015 8:49:59 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/12/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permittee <br /> <br />Code requirements and in conjunction with the instructions of the Fire Chief or his/her designee. <br /> <br />Building Façade.Permittee Subject Property <br />6. The agrees to construct the building on the in <br />accordance with the site plan and architectural elevations prepared by Miller Hanson Partners and <br />Loucks Associates, dated April 27, 2015, revised ___________, and approved by the City Council <br />on May 12, 2015 contingent upon compliance with the Staff Review Letter dated May 8, 2015. <br /> <br />Required Improvements. Permittee <br />7. The shall construct and install the following site <br />Subject Property <br />improvements on and adjacent to the in accordance with the specifications and <br />Site Plan. <br />location as shown on the The Required Improvements are as follows: <br /> <br />a. Site grading in accordance with the Grading Plan prepared by Miller Hanson Partners and <br />Loucks Associates and dated April 27, 2015, revised ______________________. <br />b. Private storm sewer and appurtenances. <br />c. Private sanitary sewer system <br />d. Private watermains and appurtenances <br />e. Private trunk and lateral storm drainage facilities <br />f. Bituminous driveways, parking lots, and maneuvering areas. <br />g. Public and private sidewalks in accordance with the Site Plan prepared by Miller Hanson <br />Partners and Loucks Associates and dated April 27, 2015, revised __________________. <br />h. Continuous, B6/12 concrete curbing and gutter around the perimeter of all bituminous surfaces. <br />i. Installation of Landscaping in accordance with the Landscape Plan prepared by Miller Hanson <br />Partners and Loucks Associates and dated April 27, 2015, revised _______________. <br />j. Irrigation metering and backflow devices shall be approved as part of the Utility Plan, and <br />installed accordingly. <br />k. Irrigation rain sensors shall be installed and appropriately placed throughout the development. <br />l. Establishment of turf in areas disturbed during construction and in accordance with the Plat. <br />m. Temporary and permanent erosion control <br /> <br />n.Installation of survey monumentation (if not already completed). <br /> <br /> ("Required Improvements)". <br /> <br /> Permittee <br />The agrees to construct the Required Improvements according to the terms and conditions <br />P City <br />of this agreement and in accordance with plans submitted to the . <br /> <br />Required Improvements Completion Date <br />8. . The Required Improvements shall be <br />completed on or before May 12, 2016. <br /> <br />Required Improvements Financial Guarantee <br />9. . In order to ensure the installation of the Required <br />CityPermittee <br />Improvements in accordance with specifications and in a timely manner, the shall be <br />CityCity <br />required to deposit with the a cash escrow or letter of credit, approved as to form by the , in <br />the amount of Three Hundred Eighty Eight Thousand Two Hundred Sixteen Dollars and No Cents. <br />$ <br />(388,216.00), which is 150% of the City's estimated cost of the Required Improvements. Prior to the <br />issuance of the building permit, all financial guarantees must be provided as required herein. <br /> <br />Upon completion of the construction of the Required Improvements, the financial guarantee shall be <br />PermitteePermittee <br />returned to the as soon as reasonably possible and the shall be required to provide <br />DevelopmentAgreement <br />the landscaping maintenance guarantee described in Paragraph 13 of this . <br />The determination of completion of the construction of the Required Improvements shall be made by <br />CityPermittee <br />the . In the event the fails to construct and install the Required Improvements as <br />Sunwood Village <br />Development Agreement <br />Page 2 of 8 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.