Laserfiche WebLink
• Center Street Improvements <br />o This project involves constructing a new street segment (Center Street) between <br />Sunwood Drive and Ramsey Parkway, across from the Municipal Center plaza. <br />o Construction began in October 2014 and is scheduled to be completed by July <br />2015. <br />o The street was opened to traffic on Thursday, June 11th <br />o Street and trail lights still need to be completed. <br />o More information on this project is available on-line at <br />www.cityoframsey.com/CenterStreet. <br />Anoka County Highway Project Updates <br />• Highway 10 & Armstrong Boulevard Interchange <br />o This Anoka County led project involves replacing the signalized at -grade <br />intersection with a grade -separated interchange and constructing a bridge over the <br />railroad tracks. <br />o Construction began in late April and is scheduled to be substantially complete by <br />November 2015. <br />o Armstrong Boulevard between Sunwood Drive and Riverdale Drive was closed <br />on May 5th and is scheduled to remain closed through October 2015. <br />o Eastbound Highway 10 is scheduled to be closed to traffic from 10 pm Tuesday, <br />June 16th, to 5 am Wednesday, June 17th. All traffic will be detoured onto <br />Riverdale Drive. <br />o More information on this project is available on-line at <br />www.highwaylOandarmstrong.com. <br />MnDOT Highway Project Updates <br />• Highway 10 Median Crossover Improvements at Feldspar Street <br />o This project involves replacing the existing Highway 10 median crossover at <br />Feldspar Street with raised median islands to prevent unsafe prohibited turns at <br />the intersection. <br />o Turning movements currently allowed and prohibited at the crossover today will <br />remain. <br />o Construction began on Monday, June 15T, and is scheduled to be completed by <br />Thursday, July 2nd <br />o The median crossover will remain closed throughout construction. <br />o Access to eastbound Highway 10 from Feldspar Street will remain open <br />throughout construction. <br />o More information on this project is available on-line at <br />http://www.dot.state.mn.us/metro/projects/hwylOramsey. <br />Our Mission: To work together to responsibly grow our community, and to provide quality, cost-effective, and efficient government services <br />