Laserfiche WebLink
Center Street and 14h Avenue NW with 135 watt LED shoebox style light fixtures mounted on 25-foot tall poles <br />that match the pole and fixture styles along Sunwood Drive, and eight (8) 50 watt LED lights on 14-foot tall poles. <br />Attached is a dated drawing showing this design. City staff requested that one of the lights between Sunwood Drive <br />and 143h Avenue be moved to north of 145th Avenue to enhance the street lighting on the east side of Center Street <br />between 145th Avenue and Ramsey Parkway. The estimated cost for this design is roughly $35,000. <br />Conduits for lighting were installed under each of the driveways and street intersections with the Center Street <br />project so none of the existing infrastructure will be damaged. <br />Timeframe: <br />Staff estimates this case will take approximately 20 minutes to present and discuss. <br />Observations/Alternatives: <br />Observations: <br />Staff requests input from the Public Works Committee on the proposed lighting levels along both of these corridors. <br />Staff wishes to request City Council approval of the preferred designs for both projects on April 14 th to allow <br />construction of the lighting systems to be cost-effectively coordinated with the completion of both projects. <br />Alternatives: <br />Alternative #1 — Motion to recommend City Council approval of the Public Works Committee's preferred lighting <br />system for each project including; <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Funding for Center Street lighting will be paid from the TOD grant received from the Metropolitan Council. <br />Funding for the lighting along Riverdale Drive will come from the City's Street Lighting Fund. These expenditures <br />will need to be approved by the City Council on April 14 th. <br />Recommendation: <br />Staff recommends alternative #1 based on the Public Works Committee's preferred design for each project. <br />Action: <br />Recommendation for City Council approval or denial of lighting systems for both projects. <br />Riverdale Drive Lighting Proposal <br />Riverdale Drive Lighting Cost Estimate <br />Center St Proposal 10 03 14 <br />Center St Proposal 2 24 14 <br />Center St Proposal 3 12 15 <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Grant Riemer Grant Riemer 03/26/2015 03:23 PM <br />Kurt Ulrich Kurt Ulrich 03/26/2015 04:03 PM <br />Form Started By: Bruce Westby Started On: 03/06/2015 07:32 AM <br />Final Approval Date: 03/26/2015 <br />