My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/31/2015
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2015
>
Agenda - Public Works Committee - 03/31/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:44:04 AM
Creation date
8/17/2015 9:09:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/31/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Updated Surface Water Management Plan (SWMP) <br />City of Ramsey, Minnesota <br />summer months, but often remain frozen later in the season and are relatively <br />impervious in the spring during the snowmelt. Hence, snowmelt runoff can be a <br />greater flood hazard than a large summer rainfall due to the impermeable nature <br />of frozen soil. Accordingly, final basin design must consider snowmelt <br />conditions when sizing storage and outlet structures. <br />When rainfalls exceed the recommended 10-year storm sewer infrastructure <br />design, the excess runoff will be accommodated by ponding in low spots in <br />streets for short periods of time and outflow through overland drainage routes <br />and/or EOFs. With proper planning, this short-term flooding and overland <br />drainage should minimize damage to property that would occur if those facilities <br />were not provided. Drainage routes and EOF locations should be protected and <br />preserved either by ordinance or through recorded permanent easements. Where <br />possible, storm water pond designs shall include an emergency overflow to <br />provide an outlet one -foot below the lowest floor elevation of any adjacent <br />structure for added safety. <br />The Rational Method is a flow rate design method that ignores volumes and <br />assumes a peak flow to each pipe based on hydrologic parameters such as <br />watershed area, time of concentration, and standard rainfall intensity curves. This <br />design method requires the selection and/or computation of a time of <br />concentration and a runoff coefficient. The time of concentration is the time <br />required for the runoff from a storm to become established and for the flow from <br />the most remote point (in time, not distance) of the drainage area to reach the <br />design point. The time of concentration will vary with the slope and type of <br />surface that the rain falls on. Rational Method design including design <br />methodology and hydrologic references should be based on the Minnesota <br />Department of Transportation Drainage Manual. <br />A minimum concentration time of fifteen minutes for residential areas and ten <br />minutes for commercial/industrial areas shall be used for design of the trunk <br />storm sewer systems. These minimum times shall be considered in the design of <br />lateral systems. As the storm water runoff enters the system, the flow time in the <br />storm sewer is then added to the concentration time and compared to the <br />downstream drainage area concentration time. The maximum of these values is <br />used downstream, which results in a longer concentration time and peak runoff <br />rate as the flow moves downstream from the initial design point. <br />5. Land Use Factors in Modeling (Runoff Coefficients) <br />The percentage of rainfall falling on an area that must be collected by a hydraulic <br />facility is dependent on watershed variables such as soil permeability, ground <br />slope, vegetation, surface depressions, type of development and antecedent <br />rainfall. These factors are taken into consideration when selecting a runoff <br />coefficient (C) for the Rational Method or a runoff curve number (CN) for use in <br />SCS methodology. <br />Under ultimate (fully developed) conditions, the values of the coefficient will <br />increase with increases in the amount of impervious surfaces caused by street <br />surfacing, building construction, and grading. <br />The antecedent moisture condition (AMC) relates to the moisture content of the <br />soil prior to a given storm event. Curve numbers based on land use can be <br />Section IV <br />March 20, 2015 Page 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.