Laserfiche WebLink
Exhibit B <br /> Improvement Project Costs <br /> Bid Prices <br /> Sanitary sewer(incl. trunk,lateral, and service stubs) $ <br /> Watermain(incl. trunk, lateral, and service stubs) $ <br /> Storm drainage facilities $ <br /> Streets(incl. concrete C&G and lot grading) $ <br /> Trail development $ <br /> Street striping and signing $ <br /> Street lights $ <br /> Sub-total $ <br /> Contingency Costs <br /> 10% Contingency $ <br /> Sub-total $ <br /> Engineering Costs <br /> 5.5% City Construction Administration/Inspection $ <br /> 2.0% City Construction Testing $ <br /> Sub-total $ <br /> Grand Total $ <br /> RIDGEPOINT <br /> Assessment Agreement <br /> Page 7 of 8 <br />