Laserfiche WebLink
Public Works Committee 5. 4. <br />Meeting Date: 06/16/2015 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Recommend Revising Street Names from (East) Town Center Drive to Center Street, and from East/West Ramsey <br />Parkway to Ramsey Parkway <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider revising the name of the north -south street between Sunwood Drive and <br />147th Lane from (East) Town Center Drive to Center Street, and to revise the name of the east -west street between <br />Armstrong Boulevard and Ramsey Boulevard from East/West Ramsey Parkway to Ramsey Parkway. <br />Background: <br />Center Street - <br />The construction of the new street segment between Sunwood Drive and Bunker Lake Boulevard known as Center <br />Street is nearly complete. Street signs were recently installed per attached plan sheets 33 and 34. As shown, these <br />signs designate the entire street segment between Sunwood Drive and Bunker Lake Boulevard as "Center Street". <br />As part of the project, the two existing ``E TOWN CENTER DR" street name sign panels at East Ramsey Parkway <br />were replaced with "Center Street" sign panels, as was the existing "Town Center Dr" street name sign panel north <br />of Bunker Lake Boulevard. The existing "Town Center Dr" street name sign at 143h Lane remains and was not <br />replaced as part of the project. Attached are photos of the existing street name signs along Town Center <br />Drive/Center Street for reference. <br />Staff is seeking a recommendation from the Public Works Committee for replacing the existing "Town Center Dr" <br />street name sign panel at 147th Lane to "Center Street", and to add "Center Street" street signs on the south side of <br />the intersection with Bunker Lake Boulevard, and at the intersection with 146th Avenue. No street name signs <br />currently exist at these two locations. Completing this work would change the name of this street from Town Center <br />Drive to Center Street between Sunwood Drive and 147th Lane. <br />New street name signs can be produced in-house using the City's sign lab. Estimated costs for replacing the sign <br />panel at 143h Lane is $50, and $400 for adding the two new intersection street signs, including posts. This results in <br />a total estimated cost of $450 for the Center Street sign modifications proposed by staff. This cost does not include <br />labor. <br />Only one property is address off of East Town Center Drive, the City's pump house, which will not present a <br />problem if renaming street. <br />Ramsev Parkwav — <br />The existing street name signs at each of the intersections along East Ramsey Parkway read "E RAMSEY PKWY". <br />As the naming convention currently stands, any new signs installed west of Center Street would read "W Ramsey <br />Pkwy". Staff proposes to change the street name along this entire corridor to "Ramsey Parkway" by dropping the <br />"East" and "West" designations. This will simplify addressing properties along this corridor in the future, and will <br />allow people to find their intended destinations easier. And by doing so now it will reduce the number of address <br />changes required in the future. <br />Currently, 20 residential properties, the Draw, and PACT Charter School are addressed off of East Ramsey <br />Parkway. If the Public Works Committee recommends changing the name of this street to Ramsey Parkway, staff <br />