Laserfiche WebLink
Exhibit B <br />Improvement Project Costs <br />Bid Prices <br />Sanitary sewer (incl. trunk, lateral, and service stubs) <br />Watermain (incl. trunk, lateral, and service stubs) <br />Storm drainage facilities <br />Streets (incl. concrete C&G and lot grading) <br />Mobilization, dewatering & traffic control <br />Street striping and signing <br />Street lights <br />Contin2encv Costs <br />10% Contingency <br />En2ineerin2 Costs <br />5.5% City Construction Administration/Inspection <br />2.0% City Construction Testing <br />Sub -total <br />Sub -total <br />Sub -total <br />Grand Total <br />$ 0.00 <br />$ 0.00 <br />$ 69,713.82 <br />$ 334,108.05 <br />$ 30,613.70 <br />$ 1,000.00 <br />$ 12,500.00 <br />$ 447,935.57 <br />$ 44,793.56 <br />$ 44,793.56 <br />$ 24,636.46 <br />$ 8,958.71 <br />$ 33,595.17 <br />$ 526,324.30 <br />RIDGEPOINT <br />Assessment Agreement <br />Page 7 of 8 <br />