My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/11/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 08/11/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:07:01 PM
Creation date
8/18/2015 9:40:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/11/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Our Mistionc To work together to reipoiibly grew our comma nityr, and to provide quality, cert-oliBcdwe, and efficient government services. <br />CC Regular Session 7. 4. <br />Meeting Date: 08/11/2015 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution 15-08-194 Accepting Bids and Awarding Contract for Ridgepoint Residential Development <br />Improvements, Improvement Project #15-21 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to accept bids and award a contract for constructing the Ridgepoint seven unit <br />single-family residential development improvements, Improvement Project #15-21. <br />Background: <br />Village Bank owns real property in the southeast corner of the City of Ramsey and wishes to develop the property <br />into seven single-family residential lots, known as Ridgepoint. Village Bank has requested that the City undertake <br />construction of the necessary public improvements in 2015 and specially assess all costs to them. <br />The proposed development generally involves extending Rivlyn Avenue approximately 500 feet to the <br />east/northeast and extending City sewer and water utilities under Rivlyn Avenue to serve the seven new <br />single-family residential lots. Significant subgrade corrections are also proposed. <br />The new extension of Rivlyn Avenue is proposed to match the existing street section with a 32 foot wide urban <br />street section that is centered within a 60 foot right-of-way, which will be deeded to the City. <br />Storm sewer, sanitary sewer and watermain utilities are also proposed to be constructed with the project. Watermain <br />and sanitary sewer utility extensions are also proposed to serve two parcels within the City of Anoka, which the <br />Anoka City Council approved payment for in the not to exceed amount of $130,000 as per the amended Joint <br />Powers Agreement between the City of Anoka and the City of Ramsey. The City of Anoka has agreed to issue <br />payment to the City of Ramsey following construction of the utility extensions. <br />The plans also propose to reconstruct a portion of the Mississippi River Trail through a realigned corridor in the <br />same general alignment and vicinity. <br />Village Bank retained Hakanson Anderson to draft final plans and specifications for the public improvements. On <br />May 26th the City Council accepted final plans and specifications and authorized advertisements for bids. On July <br />1st bids were received, opened, checked for errors and omissions, and tabulated, and the following bids comply <br />with the advertisement for bids. <br />CONTRACTOR <br />TOTAL BID <br />Douglas Kerr Underground, LLC <br />$544,925.55 <br />Dave Perkins Contracting, Inc. <br />$553,444,40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.