My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/11/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 08/11/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:07:01 PM
Creation date
8/18/2015 9:40:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/11/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
($388,216.00), which is equal to 150% of the City's estimated cost of the Required Improvements. <br />Prior to the issuance of the building permit, all fmancial guarantees must be provided as required herein. <br />Within ten (10) days after the full certificate of occupancy is issued for the Subject Property, such <br />financial guarantee shall be returned to the Permittee and the Permittee shall be required to provide <br />the landscaping maintenance guarantee described in Paragraph 13 of this Development Agreement. <br />The determination of completion of the construction of the Required Improvements shall be made by <br />the City. In the event the Permittee fails to construct and install the Required Improvements as <br />required herein in all material respects, within the timeframe provided herein (except due to acts of god <br />or other causes outside the control of Permittee), the City Council may order the completion of the <br />Required Improvements with City day labor and/or by letting contracts for said completion and draw <br />upon the escrow for payment. Only the City Council shall have the authority to direct completion of <br />the Required Improvements and withdraw from the escrow account. The Permittee hereby grants <br />permission and a license to the City and/or its contractors and assigns to enter upon the Subject <br />Property for the purpose of completing the construction and installation of the Required Improvements <br />in the event of the Permittee's default and its failure to cure any such default within 30 days after its <br />receipt of written notice thereof. <br />10. Inspection Fees. The Permittee shall be responsible for all inspection costs incurred by the City <br />related to the installation of Required Improvements. The Permittee shall make a cash deposit into the <br />appropriate escrow account at the City and the City shall have the authority to draw upon these funds <br />for the purpose of compensating for inspection services. The amount of the deposit shall be equal to <br />five percent (5%) of the estimated cost of the Required Improvements, which equates to Twelve <br />Thousand Nine Hundred Forty Dollars and No Cents ($12,940.00) (5% x $258,811.00). Upon <br />completion of the Required Improvements to the satisfaction of the City, any surplus balance remaining <br />in the City's escrow account shall be promptly refunded to the Permittee. <br />11. Payment of Development Fees. The Permittee must pay to the City the fees described on Exhibit A <br />which may include, but are not limited to, Park Land Dedication Fees, Trail Development Fees, <br />Sanitary Sewer Connection (Trunk) Fees, Water Connection (Trunk) Fees, Sanitary Sewer Lateral Fees, <br />Water Lateral Fees, Stormwater Management Fees, Street Light as well as Street Light Operation and <br />Maintenance Fees. <br />SECTION II <br />PERMITS AND OCCUPANCY <br />12. Requirements for Building Permits. No building permit for any lot on the Subject Property shall <br />be issued until: (a) a Class 5 driving surface is installed to within 300 feet of the structure; (b) Site <br />Plan approval is granted by the City and any expense incurred in giving Site Plan approval has been <br />reimbursed to the City; (c) the Building Official has been provided with a copy of the approved Site <br />Plan, signed by a registered architect or surveyor, showing all dimensions to scale; (d) the Plat has <br />been recorded at Anoka County Property Records or the City has been provided assurances in its sole <br />discretion that the Plat will be recorded prior to commencement of construction on the Subject <br />Property, (e) a Lower Rum River Watershed Management Organization Permit has been obtained. In <br />addition, the City reserves the right to suspend all building activities upon the City being notified by <br />an outside agency that the appropriate permit(s) was not obtained from the applicable agency. <br />Approval of the building foundation requires a certificate of elevation signed by a licensed (State of <br />Minnesota), professional land surveyor, verifying that the elevation with the approved grading plan <br />for the Subject Property. Foundation approvals will require a certificate of elevation verifying that the <br />Sunwood Village <br />Development Agreement <br />Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.