My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/11/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 08/11/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:07:01 PM
Creation date
8/18/2015 9:40:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/11/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 4. 5. <br />Meeting Date: 08/11/2015 <br />By: Grant Riemer, Engineering/Public <br />Works <br />Information <br />Title <br />Approve Replacement of Lift Station #1 Control Cabinet with Total Control Systems at a Cost of $45,105 <br />Purpose/Background: <br />Lift station #1 is located at the intersection of Dolomite St/137th Ave on the Southside of Hwy 10 and was <br />constructed in 1990. As this is our first and oldest lift station, it is in need of technology up -grades that will improve <br />overall operations and reduce after hour call backs, which are quite common with this lift station. <br />Notification: <br />The two property owners directly adjacent to the project will be notified of the construction schedule. <br />Observations/Alternatives: <br />The replacement of the control panel for lift station #1 first appeared on the Capital Improvement Project (CIP) in <br />2012. The city received quotes from Total Control Systems Inc. and Taylor Electric, with Total Control System Inc. <br />being the lowest quote at $45,105.00. Total Control has worked with the city in the past, developing and <br />maintaining our Supervisory Control and Data Acquisition system (SCADA). Our PW department has been pleased <br />with their past performance and has full confidence in their ability to preform this control panel upgrade. <br />Funding Source: <br />Sewer Utility Fund <br />Recommendation: <br />Staff recommends that the City Council accept Total Control Systems quote of $45,105.00 for the <br />upgrade/replacement of lift station #1 control panel. <br />Action: <br />Motion to accept Total Control Systems quote of $45,105.00 for the upgrade/replacement of lift station #1 control <br />panel or a motion to accept alternative recommendation based on council discussion. If Council has an alternative <br />direction, this item should be pulled from the Consent Agenda and placed on the regular agenda to allow for <br />discussion and direction. <br />Resolution <br />Total Control Quote <br />Taylor Electric <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Diana Lund Diana Lund 08/05/2015 11:53 AM <br />Grant Riemer (Originator) MaryJo Warner 08/05/2015 03:02 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.