My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/11/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 08/11/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:07:01 PM
Creation date
8/18/2015 9:40:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/11/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cooling fans, SS panel hoods and thermostat <br />Door switches <br />Documentation <br />Master PLC program modifications <br />SCADA software and screen additions <br />Reports <br />Master alarm dialer programming <br />Training <br />Testing and commissioning <br />Electrical contractor Bonded, licensed and insured <br />Electrical permit <br />Installation, wiring pumps, float, transducer and antenna <br />Site work and concrete pad for panel <br />Core drilling <br />Demo old equipment <br />24 foot direct bury fiberglass pole <br />Site LED shoebox lamp <br />Price for the control panel package: $45,105.00 lump sum <br />Does not include: <br />Taxes (City exempt) <br />Bonds <br />Electric utility charges <br />Restoration (by City) <br />- We acknowledge receipt of Addendum No . <br />- Terms are Net 30 days from invoice date. No retainage allowed. A 1.5% <br />charge per month added to any past due balance. Price may be dependent <br />on past credit history. <br />- All Terms in accordance to project contract specifications. <br />- This quote/proposal valid for 60 days. <br />- Work to commence after receipt of an acceptable written purchase order <br />acknowledging acceptance of our terms. <br />- F.O.B. job -site. <br />- Start-up service/training, documentation and equipment adjustment <br />is included as specified. <br />- TCSI does not accept any liquidated damages. <br />- ALL PANELS FURNISHED BY TCS WILL HAVE A UL508 SERIALIZED OR <br />UL698A ENCLOSED INDUSTRIAL CONTROL PANEL RELATING TO <br />HAZARDOUS LOCATIONS WITH INTRINSICALLY SAFE CIRCUIT <br />EXTENSIONS LABEL, AS REQUIRED. <br />If you have any questions regarding our proposal, please contact our office. We look forward to <br />working with you on this project. <br />Sincerely, <br />TOTAL CONTROL SYSTEMS, INC. <br />Al Doberstein <br />AD/Ib <br />
The URL can be used to link to this page
Your browser does not support the video tag.