My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/28/2015
Ramsey
>
Public
>
Agendas
>
Council
>
2015
>
Agenda - Council - 07/28/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 4:06:31 PM
Creation date
8/18/2015 9:54:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/28/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
68 <br />Schedule of milestones <br />The current state of the region's water supply has taken many years to develop; it will take many years <br />to change. The timeline in Figure 31 illustrates the major milestones, and subsequent text provides <br />more detail, including key milestones from each strategy. <br />Figure 29. Timeline of major milestones toward water sustainability. <br />Year(s) <br />Major Milestone <br />Ongoing <br />Outreach, education, data collection and analyses, tool development <br />2020 <br />Subregional work groups established and functioning in each hydrogeologic <br />subregion <br />All local water supply plans are guided by the Master Water Supply Plan, and <br />local controls are adopted <br />2025 <br />All local water plans and watershed management plans are informed by the <br />Master Water Supply Plan <br />2024 <br />Master Water Supply Plan updated in coordination with the to update of <br />Water Resources Policy Plan and to reflect updated regional development <br />framework <br />2027 <br />All wellhead protection plans are informed by the Master Water Supply Plan <br />2021-2030 <br />Water supply technical information informs Crow River and Northeast Area <br />wastewater reclamation facilities <br />Post -2040 <br />Water supply technical information informs East Bethel Wastewater <br />Reclamation Facility Expansion <br />Long-term Capital Improvement Program continues to support wastewater <br />reclamation and reuse <br />Progress <br />The 2010 Master Water Supply Plan described activities intended to meet 6 regional objectives: <br />1. Improve the predictive accuracy of the Twin Cities Metropolitan Area Groundwater Flow Model <br />Version 2.00 (Metro Model 2). <br />2.Assess local conditions in areas where this plan predicts that issues may arise should withdrawals <br />continue at projected levels and from traditional sources. <br />3. Develop a more thorough understanding of aquifer extent, capacity, and recharge, as well as <br />long-term trends in the levels of the region's surface and groundwater systems to manage future <br />water supply availability. <br />4. Develop a better understanding of the distribution of natural and manmade contaminants and <br />source water vulnerability. <br />5.Guide water supply development toward regionally optimal locations and sources. <br />6. Incorporating new information and using updated tools will improve the evaluation of new <br />pumping sources, locations, and pumping rates to determine regionally optimal withdrawal <br />scenarios. <br />WATER SUPPLY MASTER <br />PLAN- Draft June 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.