Laserfiche WebLink
Projected water use <br />The following should be addressed as water plans are updated: <br />• Potential for water use conflicts and well interference <br />- Due to the pervasiveness of private wells in the metro area, there exists a potential water use <br />conflict and well interference of all appropriators <br />• Potential for impacts of groundwater pumping on surface water features and ecosystems <br />- Surface waters in the community may be directly connected to regional groundwater system <br />- A spring has been mapped in or nearby the community <br />• Significant vulnerability to contamination <br />- A vulnerable Drinking Water Supply Management Area has been designated within the <br />community <br />- A Special Well and Boring Construction Area has been designated within the community <br />- Travel time from land surface to bedrock aquifers is estimated to be less than 50 years <br />• Significant uncertainty about aquifer productivity and extent <br />- Parts of the community may not be represented by a Minnesota Department of Health aqui- <br />fer test <br />- Parts of the community may not be represented by a Minnesota Department of Natural Re- <br />sources observation well <br />• Regulatory considerations <br />- A Groundwater Management Area has been designated within the community <br />The Metropolitan Council's Local Planning Handbook contains interactive maps of all of these issues, <br />and they are also summarized in Chapter 5 of this Master Water Supply Plan. <br />The following actions are recommended: <br />• Acknowledge the issues above in local water suppy plans and water appropriation permit applica- <br />tions, including a plan to monitor. <br />• Explore and support water demand (water conservation) programs such as incentives, ordinances, <br />education and outreach, rates and other approaches. The Metropoliatn Council Water Conserva- <br />tion Toolbox can support these efforts. <br />• Before requesting water appropriations, water users in this areas should evaluate the need to ad- <br />dress water conflict and well interference including a) an inventory of all active domestic and public <br />WATER SUPPLY MASTER WATER SUPPLY PROFILES <br />PLAN- Draft June 2015 <br />2020 <br />2030 <br />2040 <br />Population Served <br />27,774 <br />28,274 <br />29,074 <br />Total Population <br />28,100 <br />28,600 <br />29,400 <br />Projected Average Daily Water Use (Million Gal/Day) <br />4.5 <br />4.6 <br />4.7 <br />Total Per Capita Water Use (Gal/Person/Day) <br />162.02 <br />162.69 <br />161.66 <br />Total Per Capita Water Use, Assuming Total Water Use Remains <br />at 2011 Levels <br />146 <br />144 <br />140 <br />The following should be addressed as water plans are updated: <br />• Potential for water use conflicts and well interference <br />- Due to the pervasiveness of private wells in the metro area, there exists a potential water use <br />conflict and well interference of all appropriators <br />• Potential for impacts of groundwater pumping on surface water features and ecosystems <br />- Surface waters in the community may be directly connected to regional groundwater system <br />- A spring has been mapped in or nearby the community <br />• Significant vulnerability to contamination <br />- A vulnerable Drinking Water Supply Management Area has been designated within the <br />community <br />- A Special Well and Boring Construction Area has been designated within the community <br />- Travel time from land surface to bedrock aquifers is estimated to be less than 50 years <br />• Significant uncertainty about aquifer productivity and extent <br />- Parts of the community may not be represented by a Minnesota Department of Health aqui- <br />fer test <br />- Parts of the community may not be represented by a Minnesota Department of Natural Re- <br />sources observation well <br />• Regulatory considerations <br />- A Groundwater Management Area has been designated within the community <br />The Metropolitan Council's Local Planning Handbook contains interactive maps of all of these issues, <br />and they are also summarized in Chapter 5 of this Master Water Supply Plan. <br />The following actions are recommended: <br />• Acknowledge the issues above in local water suppy plans and water appropriation permit applica- <br />tions, including a plan to monitor. <br />• Explore and support water demand (water conservation) programs such as incentives, ordinances, <br />education and outreach, rates and other approaches. The Metropoliatn Council Water Conserva- <br />tion Toolbox can support these efforts. <br />• Before requesting water appropriations, water users in this areas should evaluate the need to ad- <br />dress water conflict and well interference including a) an inventory of all active domestic and public <br />WATER SUPPLY MASTER WATER SUPPLY PROFILES <br />PLAN- Draft June 2015 <br />